Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />. <br /> <br /> TABLE D <br /> SMALL DAM SITE RECONNAISSANCE STUDY - MODERATE SITES* <br /> Storage Estimated Feasibility <br /> Volume Construction Funds <br /> Dam Name Entity Description (ac-ft) Cost Needed to Move Foreward Needed <br /> ---------------------------- ----- ------- -------------------- ------- <br /> ---------------------------- ----- ------- -------------------- ------- <br /> Beaver Creek Dolores WCD New, Fish 1500 $1,300,000 Fishery Entity To Pay Most of Cost Eventually <br /> Big Battlement City of Delta Rebuild, Pwr 816 $348,000 Hydropower Pay Most of Cost Maybe <br /> Bootleg Henry Lyn ID Rebuild, Irrg 1500 $3,087,000 Flood Control to Pay Most of Cost Maybe <br />... <br />(ll Cucharas To Be Determined Rebuild, all 28800 $8,590,000 A Sponsoring Entity & Water Market Eventually <br /> Granby #12 Granby Ditch Co. Repair, IrTg 227 $77,900 Delta Proceed with Big Battlement No <br /> Idaho Springs City of Idaho Springs Enlarge, Mun 1400 $6,760,000 Market for Water Eventually <br /> Prospect Henrylyn Irrig. Co. Enlarge, Irrg 2958 $1,780,000 Reduce Existing Debt Maybe <br /> ---- ------- <br /> TOTALS 37201 $21,942,900 <br /> <br />* Moderate Sites are dams that need something to be ready for construction, usually entities to purchase water. <br />