Laserfiche WebLink
<br />I <br />I <br />I <br />'I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE OF CONTENTS (Continued) <br /> <br />V. CLOSED BASIN PROJECT <br /> V.1 HISTORY OF PROJECT DEVELOPMENT <br /> V.2 PROJECT PURPOSES AND OBJECTIVES <br /> V.3 PROJECT FEATURES AND OPERATION <br /> V.4 STATUS OF CLOSED BASIN PROJECT <br /> V.5 CLOSED BASIN PROJECT/CONEJOS BASIN EXCHANGE INVESTIGATION <br />VI. RIVER BASIN MODELING . <br /> <br />Page <br />35 <br />35 <br />36 <br />36 <br />39 <br />39 <br /> <br />VI. 1 <br />VI. 2 <br /> <br />SELECTION OF A HISTORIC MODELING PERIOD <br /> <br />TWO MAINSTEM DIVERSION SCENARIOS <br /> <br /> <br />VI.2.1 Step One Mainstem Diversion Scenario <br /> <br />VI.2.2 Alternate Step Two Mainstem Diversion Scenario <br /> <br />RIBS 1M MODEL CONFIGURATION <br /> <br /> <br />VI.3.1 Flow Base Generation <br /> <br /> <br />VI.3.2 Simplification of Modeled Water Rights <br /> <br /> <br />VI.3.3 Rio Grande Compact <br /> <br />VI.3.4 Closed Basin Project <br /> <br />VI.3.5 Summary of Water Use Network <br /> <br />CALIBRATION OF MODEL ...... <br /> <br /> <br />VI.4.1 Ditch Diversion Comparison <br /> <br /> <br />VI.4.2 Alamosa Return Flow Analysis <br /> <br />41 <br />41 <br />44 <br />44 <br />44 <br />46 <br />48 <br />49 <br />51 <br />56 <br />59 <br />64 <br />65 <br />66 <br /> <br />VI. 3 <br /> <br />VI. 4 <br /> <br />VII. <br /> <br />MODEL OPERATION AND INTERPRETATION <br />VII .1 WATER SUPPLY AND USE SCENARIOS <br />VII.2 TYPES OF STORABLE FLOWS <br /> VII.2.1 Storable Closed Basin Exchange Water <br /> VII.2. 2 Storable Flood Flow Determination <br /> VII.2 . 3 Storable Debit Water Determination <br /> VII.2.4 Storable Seasonal Flow Determination <br /> <br />70 <br />70 <br />71 <br />71 <br />71 <br />72 <br />72 <br /> <br />xii <br />