Laserfiche WebLink
<br /> <br />EXHIBIT 2 <br /> <br />MISCELLANEOUS RECONNAISSANCE ESTI~TE COSTS. <br />(Cost Base July 1978) <br /> <br />PENSTOCK COST <br /> <br />Effective Head (Ft) <br /> <br />10 <br /> <br />20 <br /> <br />50 <br /> <br />100 <br /> <br />200 <br /> <br />300 <br /> <br />Cost Index (CI) <br /> <br />960 <br /> <br />480 <br /> <br />200 <br /> <br />110 <br /> <br />55 <br /> <br />35 <br /> <br />Installed cost CI x Penstock Length (ft) x Installed Capacity (MW) <br />Minimum Penstock Cost is $50 per linear foot. <br /> <br />TAILRACE COST <br /> <br />Construction Cost <br /> <br />$15,000 fixed plus $200 per linear foot. <br /> <br /> SWITCHY~RD EQUIPMENT COST <br /> (Thousand Dollars) <br /> Transmission Voltaqe <br />Plant Capacity 13.8 34.5 69 115 <br />1 MW 50 60 110 160 <br />3 MW 85 100 120 175 <br />5 MW 110 125 150 210 <br />10 MW 150 170 210 280 <br />15 MW 185 220 250 320 <br /> <br /> TRANSMISSION LINE COST <br /> (Thousand Dollars) <br /> Miles of Transmission Line <br />Plant Capacity 2 5 10 15 <br />0.5 MW 30 60 150 <br />5 MW 45 80 160 320 500 <br />10 MW 60 100 180 380 600 <br />15 MW 80 140 230 460 700 <br /> <br />*Data derived from Feasibility Studies for Small Hydropower Additions - A Guide <br />Manual, Volume V (Figures 6-4 and 6-5) and Volume VI (Figure )-1 and Table 4-2), <br />U. S. Army Corps of Engineers, July 1979. <br /> <br />25 <br />