Laserfiche WebLink
<br />'" <br />- <br /> <br /> <br />TABLE 2 <br /> <br />PRINCIPAL TECHNICAL AND ECONOMIC FACTORS <br />FOR PREFEASIBILITY STUDIES <br /> <br />Determine the value of power and identify potential <br />buyers. <br /> <br />Estimate the hydroelectric power potential. <br /> <br />Assess the integrity of the dam and other existing <br />features. <br /> <br />Estimate the project costs. <br /> <br />Calculate power and energy benefits and determine <br />economic feasibility. <br /> <br />Information derived from "Developing A Site," Raymond Cunningham of <br />International Engineering Company, Inc., The Energy Bureau Conference, <br />Washington D.C., April 27- .28, 1981. p.2. <br />