Laserfiche WebLink
<br />e <br /> <br />TABLE 2 <br />GOULD DAM AND RESERVOIR <br />CONSTRUCTION COST ESTIMATE <br /> <br />PRC Report <br />Cost Item Cost Estimate <br /> <br />------------------------- -------- <br />------------------------- -------- <br /> <br />Dam and Dike (PRC Report) $2,441,000 <br />Outlet Works (PRC Report) $32,000 <br />Spillway (PRC Report) $158,000 <br />Conveyance System (PRC Report) $54,000 <br />Black Mesa Conduit (PRC Report) $1,964,000 <br />Dike Outlet Works (PRC Report) $1,164,000 <br /> <br />e <br /> <br />PRC Report Subtotal <br /> <br />$5,813,000 <br /> <br />Index from 1980 to 1993 (30%) <br /> <br />$1,744,000 <br /> <br />TOTAL ESTIMATED CONSTRUCTION COST $7,557,000 <br /> <br />Cost per Acre-foot of Additional Storage $1,890 <br />Volume of Additional Storage in Acre-reet 4000 <br /> <br />e <br /> <br />7 <br />