My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00005
CWCB
>
Publications
>
Backfile
>
PUB00005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:23 PM
Creation date
9/30/2006 9:58:42 PM
Metadata
Fields
Template:
Publications
Year
2003
Title
Small Project Loan Report 2003
CWCB Section
Finance
Author
CWCB
Description
Small Project Loan Report 2003
Publications - Doc Type
Small Project Loan Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />Grand Mesa Resel"VOlr Co. <br />September 22-23, 2003 <br /> <br />Agencla lIem 5b <br />(Upc1ated September 25. 2003) <br /> <br />Water Project Construction Loan Program-Project Data <br /> <br />Borrower: Grand Mesa Reservoir Company <br /> <br />County: Mesa <br /> <br />Project Name: Reservoirs #1 and #9 <br /> <br />Project Type: Rehabilitation <br /> <br />Drainage Basin: Gunnison <br /> <br />Water Source: Kannah Creek <br /> <br />Total Project Cost: $200.000 <br /> <br />Funding Sources: Company and ewes <br /> <br />Type of Borrower: Agricultural/Municipal <br /> <br />Blended Interest Rate: 2.4% <br /> <br />CWCB Loan: $180.000 <br /> <br />Term: 20 years <br /> <br />CWCB Grant: N/A <br /> <br />Average Annual Volume of Water diverted: 1.000 AF <br /> <br />The Grand Mesa Reservoir Company is located in Mesa County, south of Grand Junction. and <br />diverts water from Kannah Creek. The Company operates 6 reservoirs on the Grand Mesa to <br />supply water to 16 shareholders for irrigation within the 50D-acre service area. The Company <br />wants to rehabilitate the outlets on Grand Mesa Reservoirs #1 and #9, and complete spillway <br />and seepage control work on Grand Mesa Reservoir #1, to address safety concerns. The <br />project will be constructed in fall 2003. The average annual volume diverted from the reservoirs <br />is 1,000 acre-feet. The Grand Mesa Reservoir Company is a mutual ditch company and a <br />nonprofit corporation registered in the State of Colorado. Rod Bonnell, the Company's <br />Secretary-Treasurer, has completed the feasibility study using design information from Bret <br />Guillory P.E.. of the City of Grand Junction. Proposed funding for the project consists of a <br />eWCB loan in amount of $180,000 and the remainder from the Company. <br /> <br /> <br />1,...1 '%G~~L":-~' ! <br />....., / '<2/JdJ. ' . . <br />...J . lIncJ/-._ l ' <br />. ~'UfJ ,., 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.