My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00005
CWCB
>
Publications
>
Backfile
>
PUB00005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:23 PM
Creation date
9/30/2006 9:58:42 PM
Metadata
Fields
Template:
Publications
Year
2003
Title
Small Project Loan Report 2003
CWCB Section
Finance
Author
CWCB
Description
Small Project Loan Report 2003
Publications - Doc Type
Small Project Loan Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br />..- <br /> <br />MildredL,Rolhe <br />July 28-30, 2003 <br /> <br />Agenda Item 21h <br />(Updated August 7, 2003) <br /> <br />Water Project Construction Loan Program-Project Data <br /> <br />Borrower: Mildred L. Rothe <br /> <br />Counties: Morgan and Weld <br /> <br />Project Name: Rothe Augmentation Plan <br /> <br />Project Type: Well Augmentation <br /> <br />Drainage Basin: South Platte River <br /> <br />Water Source: South Platte River <br /> <br />Total Project Cost: $392.758 <br /> <br />Funding Sources: ewes and Borrower <br /> <br />Type of Borrower: Agricultural <br /> <br />Median Household Income: N/A <br /> <br />CWCB Loan: $353,482 <br /> <br />Interest Rate: 2.5% Term: 30 years <br /> <br />CWCB Grant: $600 <br /> <br />Average annual well pumping: 4,800 acre-feet <br /> <br />Mildred L. Rothe is an owner of the Rothe Farm, consisting of 9,000 acres, 3055 acres of which <br />are irrigated with wells. The fann is located in Morgan and Weld Counties. near the town of <br />Orchard. The project involves construction of several recharge wells, augmentation wells. <br />recharge ponds. and pipelines. The project will generate augmentation credits to cover depletions <br />for 17 irrigation wells used on the Rothe Farm. The project will be completed by fall 2003. Brent <br />Nation. P.E.. of Nation Engineering Services has completed the feasibility study. Proposed <br />funding for the project consists of a 5353,482 Small Project Loan and a $600 Feasibility Study <br />Grant from the ewes. and the remainder from the Borrower. <br /> <br />Rothe Augmentation Project <br /> <br /> <br />Location Map <br />
The URL can be used to link to this page
Your browser does not support the video tag.