My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00005
CWCB
>
Publications
>
Backfile
>
PUB00005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:23 PM
Creation date
9/30/2006 9:58:42 PM
Metadata
Fields
Template:
Publications
Year
2003
Title
Small Project Loan Report 2003
CWCB Section
Finance
Author
CWCB
Description
Small Project Loan Report 2003
Publications - Doc Type
Small Project Loan Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Glenn D. Toyne _ Well Augmentallon Project <br />March 25-26. 2003 <br /> <br />Agenda Item 24d <br /> <br />Water Project Construction Loan Program-Project Data <br /> <br />Borrower: <br /> <br />Glen D. Toyne (GDT) <br /> <br />County: Secgwick <br />Project Type: Well Augmentation <br /> <br />Project Name: Toyne Recharge Project <br /> <br />Drainage Basin: South Platte <br /> <br />Water Source: New wells <br /> <br />Total Project Cost: $115.000 <br /> <br />Funding Sources: CWCS <br /> <br />Type of Borrower: Agricultural <br /> <br />AVer. Delivery: 3500 acre-feet <br /> <br />CWCS Small Project Loan: $75.600 <br /> <br />Interest Rate: 2.75% Term: 30 years <br /> <br />GOT is a private family farm located 14 miles south of Julesurg in Sedgewick County. GOT has <br />approximately 517 acres of irrigated farm ground. There are B tributary groundwater wells, which <br />were drilled in the late 1960's and ear1y 1970's. The wells pump on average 1100 acre-feet <br />annually. The water is typically used to irrigate com, alfalfa, beans and wheat. The Bwells are <br />currently augmented under the Groundwater Appropriators of the South Platte (GASP) plan of <br />operation GOT is completely dependent on their 8 wells, which have very junior water rights. GOT <br />has been using GASP to replace depletions from well pumping when there is a senior water right <br />"call" on the river. GOT plans to construct a well to pump water into a recharge pond in the winter <br />months when there is not a call on the river. Water from the pond would have a delayed return to <br />the river in summer months when GOT has depletions that need to be offset with augmentation <br />water. The well, drilled near the South Platte River, would pump up to a rate of 7.8 ds, producing <br />up to 3500 acre feet annually. They would pump to the recharge ponds through 15" underground <br />piping. An additional well for augmentation would be drilled near the recharge pond, and the piping <br />used to return .stored- water to the river when necessary. <br /> <br /> <br />'. ~ ~ <br />'B 1 <br />"" <br /> <br /><.- <br />, <br />\1 <br />" <br /> <br />. <br /> <br />. <br />. <br /> <br />.. <br />w <br />.. <br /> <br />~ ProjectV'f <br />~:_~= i Location '" <br /> <br />", -. - - _.- -:." -~:::-.~.~'i~~ ~;'i0:;~~~1f1'Jt~!lW.~;1";~;":i,,;:~,: ., <br /> <br />'. .. ......~.._o'w;oJOIijt.-. .' u;c.;::: ..... .... ..t... ......... . .... ............ ,. <br />.: -,::,':Y ;{tt:fi:;~~::::?;:r:.;:';{:';' //?)::.;' ..;:::;:.;.,\:.~ :;: .\, ":;:{H;:~:\:: ..:~[ <br />~ ..."...... .........'..... ..:~ .g:t....~. ...........f ........ ..... '. ....... .... <br />):g?illt~!:<~:1::~M~~M1~~~%t~;J\: ,,:\~1~li~J:?~:::':'.. i .J~_ ~~r?\{ ~W~; <br /> <br />I: <br /> <br />Location Map <br />
The URL can be used to link to this page
Your browser does not support the video tag.