My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00005
CWCB
>
Publications
>
Backfile
>
PUB00005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:23 PM
Creation date
9/30/2006 9:58:42 PM
Metadata
Fields
Template:
Publications
Year
2003
Title
Small Project Loan Report 2003
CWCB Section
Finance
Author
CWCB
Description
Small Project Loan Report 2003
Publications - Doc Type
Small Project Loan Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Silt Water Conservancy District <br />March 24-26, 2003 <br /> <br />Agenda Item 243. <br />(updated March 27, 2003) <br /> <br />Water Project Construction Loan Program-Project Data <br /> <br />Borrower: Silt Water Conservancy District <br /> <br />County: Garfield <br /> <br />Project Name: Transformer Replacement <br /> <br />Project Type: Pump Plant Rehabilitation <br /> <br />Drainage Basin: <br /> <br />Colorado River <br /> <br />Water Source: Colorado River <br /> <br />Total Project Cost: 5540.100 <br /> <br />Funding Sources: CWCS and District <br /> <br />Type of Borrower: Agricultural <br /> <br />Median Household Income: N/A <br /> <br />CWCB Loan: $486.000 <br /> <br />Interest Rate: 2.75% Term: 30 years <br /> <br />CWCB Grant: $5.000 <br /> <br />Average water pumped per Year: 4,000 acre-feet <br /> <br />The Silt Water Conservancy District operates a pump plant on the Colorado River to deliver water to <br />its Pump Canal. which serves agricultural users on the lower reaches of Silt Mesa. The pump plant <br />was built in the mid 1960's, and is located 2 miles east of the Town of Silt. It has a capacity of 36 <br />CFS, and delivers an average of 4,000 acre-feet per year. The pump plant transformer must be <br />replaced due to an upgrade of the transmission line by Xcel Energy. Westem Area Power <br />Administration will design the project in 2003, and construction will be completed in 2004. The District <br />has completed the feasibility study using information from the preliminary design. Proposed funding <br />for the project consists of a $486,000 Small Project Loan and a $5,000 Feasibility Study Grant from <br />the CWCS, a $15,000 planning grant from the Bureau of Reclamation. and the remainder from the <br />District. <br /> <br /> <br />Location Map <br />
The URL can be used to link to this page
Your browser does not support the video tag.