My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00004
CWCB
>
Publications
>
Backfile
>
PUB00004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2011 11:03:32 AM
Creation date
9/30/2006 9:58:35 PM
Metadata
Fields
Template:
Publications
Year
2003
Title
Gunnison Basin Water: No Panacea for the Front Range
CWCB Section
Administration
Author
Land and Water Fund
Description
Gunnison Basin Water: No Panacea for the Front Range
Publications - Doc Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />The Gunnison: A Basin In Balance <br /> <br />· Facilities: <br /> <br />. Year: <br /> <br />. Location: <br /> <br />· Water Use: <br /> <br />. Facilities: <br /> <br />· Year: <br /> <br />. Location: <br />· Water Use: <br /> <br />CD <br /> <br />Uncompahgre Project <br />Gunnison Diversion Dam and Gunnison Tunnel <br />Completed 1 909 <br />35 miles west of Gunnison, just below Crystal Dam <br />Average diversion 365,000 AF <br /> <br />Taylor Pork Reservoir <br />Completed 1 937 <br />25 miles northeast of Almont, on the Taylor River <br />Average releases 154,000 AF <br /> <br />The UVWUA operates these facilities to divert water into the Gunnison Tunnel <br />for delivery to farmers and ranchers in Ouray, Delta, and Montrose counties, where it <br />is used as a supplemental supply for irrigation of about 76,000 acres of land. n The <br />UVWUA and others hold conditional water rights that, if developed, will increase the <br />flow of water through the Thnnel. They are described in Chapter 2. <br /> <br />The second component of the Uncompahgre Project, Taylor Park Reservoir, <br />was constructed by the Bureau of Reclamation on the Taylor River west of <br />Cottonwood ~ss to provide a supplemental supply of water for the Gunnison Thnnel <br />and the UVWUA. It is now operated not only for irrigation but also for flatwater <br />recreation and for the release of water 10 "enhance the fishery and recreational uses <br />of the Taylor and Gunnison Rivers above Blue Mesa Reservoir."" <br /> <br />The initial storage water righl for Taylor Park, for the reservoir's "first fill," was <br />decreed in 1941 for 111,260 AF with a priority date of December 18,1933, for irriga- <br />tion and other purposes. In 1986, the 1904 decree was modified to eliminate non-irri- <br />gation uses, except for a minimal hydroelectric right. The average annual volume of <br />water discharged from Taylor Park for the period from <br />1952 to 1988 was approximately 154,000 AF." In 1990 a <br />decree was issued in Water Division 4 to clarify the rights <br />to the "second fill" of Taylor Park reservoir. This decree <br />ratified practices in place under an exchange agreement <br />with the Aspinall Unit and is described after this report's <br />explanation of the Aspinall Unit. <br /> <br />2. Aspinall Unit <br /> <br />The Aspinall Unit, constructed in the 1960s and <br />1970s, includes three dams and their like-named reser- <br />voirs: Blue Mesa, Morrow Point, and Crystal. Together, <br />they back up the Gunnison for forty river miles, from ten <br />miles below the City of Gunnison all the way to the <br />Gunnison Thnnel. These facilities provide water for, <br />among other things, hydroelectric power, flat-water <br /> <br />Gunnison Basin Water <br /> <br /> <br />MOlTOW Point Dam <br />Source: Bureau of Reclamation <br /> <br />. 3 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.