Laserfiche WebLink
<br />III. Selected Issues Arisina in Gunnison River Litiaation. <br />A. Description of Arapahoe County and Aurora projects. <br />B. Case management and pre-trial decisions: <br />1. Bifurcation. <br />a. Phase I: Water Availability (physical and <br />legal questions); ability to build structures <br />(property interests and permitting). <br />b. Phase II: Economic feasibility (yield vs. <br />cost); all remaining issues such as intent, <br />need and speculation. <br />2. Consideration of "can and will" (C.R.S. S 37-92- <br />305(9) (b)). <br />3. Other pre-trial rulings: speculation, public <br />trust, maximum utilization and optimum use, public <br />value, relationship with Federal projects, etc. <br />C. Water availability. <br />1. Case law precedent: Southeastern Colorado Water <br />Conservancy District v. Florence, 688 P.2d 715 <br />(1984). <br />2. Bow model? <br />a. Network or spreadsheet? Bow much detail is <br />necessary? <br />b. Physical availability, particularly ungaged <br />locations. <br /> <br />-2- <br />