My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
I-25 Landscape Master Plan
CWCB
>
Water Conservation
>
Backfile
>
I-25 Landscape Master Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2010 12:31:52 PM
Creation date
9/30/2006 9:05:08 PM
Metadata
Fields
Template:
Water Conservation
Project Type
Water Conservation Plan
Project Name
Department of Transportation
Title
I-25 in Denver, Colorado Landscape Master Plan
Date
5/5/1988
County
Denver
Water Conservation - Doc Type
Complete Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ITEM NO. <br />Z7. <br />ZB. <br /> <br />Z9. <br />30. <br />3t. <br />32. <br />33. <br />34. <br />35. <br />36. <br />37. <br />3B. <br />39. <br />40. <br />41. <br />42. <br /> <br />43. <br /> <br />SYMBOLS <br />___..2."_ __ <br />-------- <br />~ <br /> <br />DESCRIPTION <br />EXISTING SLEEVE PIPING AND SIZE <br />CONTROLLER SEQUENCE. REMOTE CONTROL SIZE AND GALLONS <br />PER MINUTE ' <br />DETAIL NUMBER AND SHEET NUMBER <br />SUB-INJECTED TUBING <br />fLOOD IRRIGATOR <br />1/4, 1/3. 1/2 AND fULL CIRCLE SHRUB UNDERSIZE HEADS <br />1/4. 1/3, 1/2 AND fULL CIRCLE SHRUB STANDARD HEADS <br />1/4. 1/3. 1/2 AND fULL CIRCLE SHRUB OVERSIZE HEADS <br />1/4, 1/3. 1/2 AND fULL CIRCLE SHRUB STREAK SPRAY <br />1/4. t/3. 1/2 AND fULL CIRCLE LAWN HEAD UNDERSIZE <br />1/4. t/3, 1/2 AND fULL CIRCLE LAWN HEAD STANDARD <br />1/4. 1/3, 1/2 AND fULL CIRCLE lAWN HEAD OVERSIZE <br />PART CIRCLE ROTOR HEADS <br />fULL CIRCLE ROTOR HEADS <br />1/4, 1/2 AND fULL CIRCLE fLAT SHRUB HEADS <br />ON ALL OSCILLATING AND ROTOR HEADS DESIGNATE <br />BY USING A LETTER NEXT TO HEAD TO DENOTE MODEL <br />AND NOZZLE SIZE <br />END STRIP. SIDE. CENTER <br /> <br />~ <br /> <br />111111111111 <br /> <br />. <br /> <br />. II & 0 <br /> <br />iii D g . <br /> <br />II It .1 d <br /> <br />. . Q 0 <br /> <br />lDoeo <br /> <br />000. <br />~g4. <br /> <br />QgO <br /> <br />o <br /> <br />9\1X <br /> <br />QQ". <br /> <br />AAA <br /> <br />C. POINT Of CONNECTION (POC) <br />INfORMATION fOR EACH POC SHALL INCLUDE THE fOLLOWING: <br />1. EXACT LOCATION Of EACH POC TOGETHER WITH TIE IN fITTINGS WHERE KNOWN. <br />2. TYPE. SIZE AND LENGTH Of METER SERVICE PIPING. <br />3. METER TYPE AND SIZE. <br />4. STATIC WATER PRESSURE. <br />5. SYSTEM DESIGN PRESSURE. <br />6. PEAK fLOW REQUIREMENT. <br />D. INSTALLATION DETAILS <br />PROVIDE INSTALLATION DETAILS AS REQUIRED fOR ALL MAJOR COMPONENTS Of <br />THE SYSTEM SUC/I AS TIlE fOLLOWIIlG: <br /> <br />I <br />I <br /> <br />, <br /> <br />.1 <br /> <br />54. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.