My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arvada 1996 WCPlan
CWCB
>
Water Conservation
>
Backfile
>
Arvada 1996 WCPlan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2011 3:31:06 PM
Creation date
9/30/2006 9:03:39 PM
Metadata
Fields
Template:
Water Conservation
Project Type
Water Conservation Plan
Project Name
Arvada Water Conservation Plan
Title
Water Conservation Master Plan
Date
6/25/1996
County
Adams
Jefferson
Water Conservation - Doc Type
Complete Plan
Document Relationships
Arvada 1996 WCPlan Approval Ltr
(Message)
Path:
\Water Conservation\Backfile
Arvada 1996 WCPlan Implmtn Plan
(Message)
Path:
\Water Conservation\Backfile
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />TABLE 2 <br /> <br />CITY OF ARVADA <br />DEMAND REDUCTION FOR THE <br />PROPOSED WATER CONSERVATION PROGRAM <br /> <br />proaram <br /> <br />Total <br /> <br />savinas <br />o AF <br />171 AF <br />1,257 AF <br />225 AF <br />245 AF <br />113 AF <br />63 AF <br />60 AF <br />276 AF <br />2,410 AF <br /> <br />Metering <br /> <br />Residential <br />Plumbing Retrofit <br />Plumbing Code Changes <br />ET <br />Xeriscape <br /> <br />Commercial (ET, Retro., Xs.) <br />Leak Detection <br /> <br />Parks <br /> <br />Pricing <br /> <br />Where Savinas will Be Realized <br /> <br />Existing <br />Future Growth <br /> <br />691 AF <br />1,719 AF <br /> <br />Total <br /> <br />2,410 AF <br /> <br />Annual Costs (1989 Dollars) <br /> <br />. - . - - - - - - - -PeI'serme-l - - - - - - - - <br />1. 5 FTE <br /> <br />$45,000 <br /> <br />other Costs Including MWCI, Monitoring, <br />Leak Detection, Supplies, and Public <br />Information $35,000 <br /> <br />Total Costs $80,000 <br /> <br />Total Costs From 1990 to Buildout $3,600,000 <br />(No Inflation) <br /> <br />Cost Per Acre-Foot 11989 Dollars) $1,494 <br /> <br />/lvI/WC-Tab2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.