Laserfiche WebLink
<br />TABLE 2 <br /> <br />CITY OF ARVADA <br />DEMAND REDUCTION FOR THE <br />PROPOSED WATER CONSERVATION PROGRAM <br /> <br />proaram <br /> <br />Total <br /> <br />savinas <br />o AF <br />171 AF <br />1,257 AF <br />225 AF <br />245 AF <br />113 AF <br />63 AF <br />60 AF <br />276 AF <br />2,410 AF <br /> <br />Metering <br /> <br />Residential <br />Plumbing Retrofit <br />Plumbing Code Changes <br />ET <br />Xeriscape <br /> <br />Commercial (ET, Retro., Xs.) <br />Leak Detection <br /> <br />Parks <br /> <br />Pricing <br /> <br />Where Savinas will Be Realized <br /> <br />Existing <br />Future Growth <br /> <br />691 AF <br />1,719 AF <br /> <br />Total <br /> <br />2,410 AF <br /> <br />Annual Costs (1989 Dollars) <br /> <br />. - . - - - - - - - -PeI'serme-l - - - - - - - - <br />1. 5 FTE <br /> <br />$45,000 <br /> <br />other Costs Including MWCI, Monitoring, <br />Leak Detection, Supplies, and Public <br />Information $35,000 <br /> <br />Total Costs $80,000 <br /> <br />Total Costs From 1990 to Buildout $3,600,000 <br />(No Inflation) <br /> <br />Cost Per Acre-Foot 11989 Dollars) $1,494 <br /> <br />/lvI/WC-Tab2 <br />