Laserfiche WebLink
<br />.. <br /> <br />. <br /> <br />. <br /> <br />EXHIBIT A <br /> <br />1. Scone of &rviCP.l!I <br /> <br />The Project (Phase II-B) consists of the Contractor continuing Phase II-A development of a gravity flow irrigation <br />system. This system distributes raw water to public and residential sites within the community. The Project <br />will include the metering of all taps installed during Phase II-A and meter installation for Phase II-B taps. <br /> <br />The goals of the Project are to reduce the amount of treated water used for irrigation; to extend the life of the <br />current water treatment plant; to reduce captial cost associated with compliance with EPA's Safe Drinking Water <br />Act regulations; and to increase the community's capacity to provide potable and nonpotable water for residential, <br />commercial, or industrial uses; and to provide water conservation notices with the monthly billing statements. <br /> <br />The Contractor will monitor water conBusmption before and after implementation of the improvements and will <br />include meter readings prior to the conversion to raw water irrigation. All raw water taps win be metered. and <br />billed for water usage. Meter readings and use recordings will be performed after the conversion to raw water <br />irrigation to define cost savings to the community. <br /> <br />A Final Report shall be compiled upon completion of the Project. The Final Report shall include a summary of <br />the Project, discussion of the Project implementation, Project findings and water savings results. The Final <br />Report will not only conclude the Project but will serve as information to be shared with other Colorado <br />communities. <br /> <br />2. Proieet Time of Performance <br /> <br />The Project will commence on February 10, 1996 or upon full and proper execution of this Contract. <br /> <br />The Project will be completed on or before December 30,1998. However, the Project time of performance may be <br />extended subject to the mutual agreement of the State and Contractor. A written request for extension shall be <br />suhmitted to the State by the Contractor at least thirty (30) daya prior to December 30, 1998, and shall include <br />a full justification for the extension request. <br /> <br />Page I of 2 Pages <br />