<br />]
<br />1
<br />]
<br />'J
<br />1
<br />\1,':
<br />'J
<br />
<br />'U
<br />
<br />,
<br />
<br />,:].
<br />0'.
<br />I.'
<br />,\
<br />
<br />IJ
<br />IJ
<br />I :',
<br />,
<br />
<br />IU
<br />la__
<br />II
<br />]1
<br />
<br />"
<br />:in'
<br />,.,
<br />.,.,~
<br />
<br />,
<br />
<br />U,'
<br />"
<br />, ,
<br />>,
<br />.,
<br />~I
<br />4~
<br />',II,
<br />-::1
<br />
<br />(g) WATER RATE STRUCTURES DESIGNED TO ENCOURAGE WATER
<br />USE EFFICIENCY IN A FISCALLY RESPONSIBLE HANNER;
<br />
<br />(h) REGULATORY MEASURES, INCLUDING STANDARDS FOR THE USE
<br />OF WATER USE EFFICIENCY FIXTURES ANO LANDSCAPES, AND
<br />ORDINANCES, CODES, DR OTHER LAW DESIGNED TO ENCOURAGE WATER
<br />USE EFFICIENCY;
<br />
<br />(i) , INCENTIVES TO IMPLEMENT WATER USE EFF!CIENCY
<br />TECHNIQUES, INCLUDING REBATES 'TO CUSTOMERS OR OTHERS TO
<br />ENCOURAGE THE INSTALLATION OF WATER USE EFFICIENCY MEASURES.
<br />
<br />(5) THE PLAN TO BE ADOPTED UNDER SUBSECTION (2) OF THIS
<br />SECTION SHALL CONTAIN A SECTION STATING THE COVERED ENTITY'S
<br />BEST JUDGMENT Of THE ROLE Of WATER USE EFFICIENCY PLANS IN THE
<br />, COVERED ENTITY I S WATER SUPPLY PLAIHlING. _
<br />
<br />, (6)'" EXCEPT FOR THE ELEMENTS OF A WATER USE EFFICIENCY
<br />, PLAN' WHICH A COVERED 'ENTITY HAS ALREADY IMPLEMENTED PRIOR TO
<br />THE EFFECTIVE DATE OF THIS SECTION, THE PLAN REQUIRED UNDER
<br />SUBSECTION ,(2) OF THIS SECTION SHALL SET FORTH RESULTS OF THE
<br />CONSIDERATION OF THE WATER-EFFICIENT MEASURES AND TECHNIQUES
<br />SET" FORTH HI SUBSECTION (4) AND ADOPTED BY THE CDVERED ENTITY
<br />AFTER THE EFFECTIVE DATE OF THIS SECTION.
<br />
<br />, ,(7) EXCEPT fOR THE ELEMENTS OF A WATER USE EFFICIENCY
<br />PLAN WHICH A CDVEREO ENTITY HAS ALREAOY IMPLEMENTED PRIOR TD
<br />THE EFFECTIVE DATE OF THIS SECTION, BEFORE ADOPTING ANY OTHER
<br />MAJOR ELEMENTS OF A PLAN UNDER SUBSECTIONS (2) AND (4) OF THIS
<br />SECTION, EACH COVERED ENTITY SHALL PUBLISH A DRAFT PLAN, GIVE
<br />PUBLIC NOTICE OF THE PLAN, MAKE SUCH PLAN PUBLICLY AVAILABLE,
<br />AND SOLICIT COMMENTS FROM THE PUBLIC FOR A PERIOD OF NOT LESS
<br />THAN SIXTY DAYS AFTER THE DATE ON WHICH THE DRAFT PLAN IS MADE
<br />PUBLICLY AVAILABLE. REFERENCE SHALL Bt MADE IN THE PUBLIC
<br />NOTICE TO THE ELEMENTS OF A PLAN THAT' HAS ALREADY BEEN
<br />IMPLEMENTED.
<br />
<br />(B) A COVERED ENTITY MAY AT ANY TIME ADOPT CHANGES TO
<br />THE PLAN. IF THE PROPOSED CHANGES ARE MAJOR, THE COVERED
<br />EIU II Y ~ffALL GIVE--PUBtlC-riOirCE OF 'f-HE--€ltA{l6E5, PAKl; -THE-
<br />,CHANGES AVAILABLE IN DRAFT FORM, AND PROVIDE THE PUBLIC AN
<br />OPPORTUNITY TO COMMENT ON SUCH CHANGES BEFORE ADOPTING THEM.
<br />
<br />(9) '(a), AFTER FrvE YEARS FOLLOWING THE EFFECTIVE DATE OF
<br />THIS SECTION, NEITHER THE BOARD NOR THE COLORADO WATER
<br />RESOURCES ANO POWER DEVELOPMENT AUTHORITY SHALL ACCEPT AN
<br />APPLICATION FROM A COVERED ENTITY FOR FINANCIAL ASSISTANCE IN
<br />THE CONSTRUCTION OF ,ANY WATER DIVERSION, STORAGE, CONVEYANCE,
<br />WATER TREATMENT, OR WASTEWATER TREATMENT FACILITY UNLESS SUCH
<br />COVERED ENTITY [NCLUDES A COpy OF THE WATER USE EFFICIENCY
<br />PLAN ADOPTED PURSUANT TO THIS SECTION AND A COpy OF OTHER SUCH
<br />PLANS, IF ANY, OTHERWISE ADOPTED BY THE-COVERED ENTITY.
<br />
<br />e
<br />
<br />PAGE 5-HOUSE BILL 91-1154
<br />
<br />,-
<br />
|