Laserfiche WebLink
<br />Section V - Chart of Program Implementation <br /> <br /> Measure Start Date End Date City ofC. <br /> ('nrt. <br />I Water Efficient Fixtures 1992 On,going No-cost <br />II Low Water Use Landscapes and Efficient I,andscapes <br /> Xeriscaping Model at Wastewater Treatment Plant 1993 On-going $11,000 <br />III Water Efflcient Industrial and Commercial Processes <br /> Not Applicable to City of Craig 1996 On-going No-cost <br />IV Water Reuse Systems <br /> Bio-pond 1992 On-going $10,000 <br /> Xeriscaping and Lawn at WWTP (irrigation) 1992 On'going $1,300 <br />V DIstribution and Leak Repair <br /> Professional Leak Survey 1992 2000 $7,500 <br /> Professional Leak Survey 1993 2001 $7,500 <br /> Water Main Replacement Program 1987 On-going $2,500,000 <br /> (to date) <br /> In,house Leak Detection and Equipment 1987 On-going $3,OOO/year <br />VI Dissemination of Information Min. cost of <br /> manpower hr. <br /> Xeriscape Education and Tours ofWWTP Grounds 1992 On,going $600/year <br /> (estimated) <br /> Meetings, Discussions, and Referral of Information to Public 1990 On-going $600/year <br /> (estimated) <br />VII Water Rate Structure 1991 On-going Manpower hr. <br />$3 000 (estmtd.) <br />VIII Regulatory Measures <br /> Wasting Water COrd. 565 Art. 2 ss 10) 1980 On-going No-cost <br /> Service Line Regulations (Ord. 565 Art. 2 ss 8) 1980 On-going No-cost <br />IX Incentives to Implement Water Use Efficiency T echulques N/A N/A No-cost <br />X Other Water Management Activities <br /> Elkhead Reservoir Expansion 1997 On-going $600,000 <br /> (+ ..trcld. r..e",e) <br />