My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
La Salle Open Space Contract
CWCB
>
Water Conservation
>
Backfile
>
La Salle Open Space Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 1:49:41 PM
Creation date
9/30/2006 9:01:59 PM
Metadata
Fields
Template:
Water Conservation
Project Type
Ag/Muni Grant
Contract/PO #
C153600
Applicant
Town of La Salle
Project Name
Water Conservation For Public Open Space
Title
Contract
Date
4/16/1992
County
Weld
Water Conservation - Doc Type
Contract
Document Relationships
La Salle Open Space Applic
(Message)
Path:
\Water Conservation\Backfile
La Salle Open Space Approval Letter
(Message)
Path:
\Water Conservation\Backfile
La Salle Open Space Final Report
(Message)
Path:
\Water Conservation\Backfile
La Salle Open Space Work Plan
(Message)
Path:
\Water Conservation\Backfile
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6. Accountin2:. At all times from the effective date of this Contract until completion of this Project, the Contractor shall maintain properly <br />segregated books of State funds, matching funds. and other funds associated with this Project. All receipts and expenditures associated with said Project <br />shall be documented in a detailed and specific manner, and shall accord with the -Budget- set forth in Exhibit A. Contractor may adjust budgeted <br />expenditure amounts up to ten percent (10%) within said Budget without approval of the State. Adjustments of budget expenditure amounts in excess <br />of ten percent (10%) must be authorized by the State in an amendment to this Contract properly executed and approved pursuant to the State FISCal Rules. <br />In no event shall the State's total consideration exceed the amount shown in Paragraph 5 above. <br /> <br />a. Unless otherwise provided in this Contract, if Exhibit A provides for more than one payment by the State, <br />the initial payment set forth in the Payment Schedule shall be made as soon as practicable after proper <br />execution of this Contract. The Contractor shall initiate all subsequent payment requests by submitting <br />documented proof of proper expendHure of State funds thus far received to a contract monitor designated <br />by Ihe State. <br /> <br />b. The Contractor shan request the finaJ payment, which is the amount withheld by the State until the Project <br />is accepted for completion. for the Project by submitting to the contract monitor a detailed costs accounting <br />of all State funds received and expended towards completion of the Project which sbaD be included in a <br />final project report. Upon determining to its satisfaction that all funds received by the Contractor have <br />been properly spent towards the goals of the Project, the State shall promptly make final payment to the <br />Contractor. <br /> <br />c. Within ninety (90) days of completion of the Project, the Contractor shall submit to the contract monitor <br />a detailed cost accounting of expenditures of the final payment received from the State as well as a full and <br />final project expenditure report. Any State funds not expended in connection with the Project shaJl be <br />remitted to the State at that time. <br /> <br />7. Audit. The State or its authorized representative shall have the right to inspect. examine, and audit Contractor's records, books and <br />accounts, including the right to hire an independent Certified Public Accountant of the State's choosing and at the State's expense to do so. Such <br />discretionary audit may be called for at any time and for any reason from the effective date of this Contract until fIVe (5) years after the date final <br />payment for this Project is received by the contractor, provided that the audit is performed at a time convenient to the Contractor and during regular <br />business houts. Whether or not the State calls for a discretionary audit as provided for in this paragraph, if the Project is accomplished within a single <br />fiscal year of the Contract, the Contractor shall, at the conclusion of the Project, and in addition to any other reports required, submit a report and <br />auditor's statement of the Project account to the Colorado Water Conservation Board. Such repon shall be prepared in conjunction with Contractor's <br />regular yearly audit, and must be submitted within six (6) months after the close of the then current Contractor's fiscal year. <br /> <br />8. Indeoendent Contractor. <br /> <br />a. Contractor is a grantee and shall be an independent contractor and shall have no authorization, express or implied, to bind the <br />State to any agreements, settlements, liability or understanding except as expressly set forth herein. <br /> <br />b. The Contractor represents that the Contractor has, or will secure at its own expense all personnel, as employees of the <br />Contractor, necessary to perform the work and services required to be performed by the Contractor under this Contract. Such <br />personnel may not be employees of or have any contractual relationship with the State and no such personnel are eligible for <br />any employee benefits. unemployment compensation or any other benefits accorded to State employees and Contractor agrees <br />to indemnify the State for any costs for which the State may be found liable in these regards. Contractor shall pay when due <br />all required employment taxes and income tax withholding. AU of the services required hereunder will be performed by the <br />Contractor or under its supervision, and all personnel engaged in the work shall be fully qualified and shall be authorized under <br />State and local law to perform such seIVices. <br /> <br />9. Termination of Contract for Cause. ]f, through any cause, the Contractor shall fail to fulfill in a timely and proper n14mner his <br />obligations under this Contract, or if the Contractor shall violate any of the covenants, agreements, or stipulations of this Contract, the State shall <br />thereupon have the right to tenninate this Contract for cause by giving written notice to the Contractor of such termination and specifying the effective <br />date thereof, at least fwe (5) days before the effective date of such termination. In that event, aU finished or unfinished documents, data, studies, <br />surveys, drawings, maps, models, photographs, and reports or other material prepared by the Contractor under this Contract shall. at the option of <br />the State, become its property, and the Contractor shall be entitled to receM: just and equitable compensation for any satisfactory work completed <br />on such documents and other materials. <br /> <br />Notwithstanding the above, the Contractor shall not be relieved of liability to the State for any damages sustained by the State by virtue <br />of any breach of the Contract by the Contractor, and the State may withhold any payments to the Contractor for the purpose of setoff until such time <br />as the exact amount of damages due the State from the Contractor is detennined. <br /> <br />Page 2 of 6 Pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.