Laserfiche WebLink
<br />;-\ <br />I <br />I <br />I <br /> <br />) <br />I <br />I <br />I <br /> <br />\ <br />\ <br />i <br /> <br />UJ <br />I <br />) <br />1 <br />I <br /> <br />GOAL <br />ROLE MODEL <br /> <br />The City of Longmont is committed to act as a role model for the community in implementing. <br />practicing and achieving water conservation. <br /> <br />BEST MANAGEMENT PRACTICES <br /> <br />1. <br /> <br />Meter all City facilities and track consumption <br />Potable water usage at all City facilities must be metered in order to document accurate <br />water use and measure the effectiveness of conservation measures. <br /> <br />Status: All City facilities, with a few exceptions are metered. Metering captures 97% <br />of City water use. <br /> <br />Implementation: All City facilities will be metered by December 31, 1995. <br /> <br />2. <br /> <br />Evaluate retrofit of Citv buildin!!s with low water use plumbin!! fixtures <br /> <br />Status: City facilities built after 1990 have low water use plumbing fixtures installed (3.5 <br />gallon or less per flush); facilities built prior to 1990 do not <br /> <br />Implementation: <br />. Toilets: Displacement bags will be installed in all 5-7 gallon flush toilets in 1996. As <br />toilets go out of service. they will be replaced with 1.6 gallon flush toilets. It is estimated <br />the installation of displacement bags will save 689 thousand gallons of water per year. <br />and total replacement of toilets with 1.6 gallons flush toilets will save 2,065 thousand <br />gallons of water per year. <br />. Faucets: Aerators will be installed in all faucets in 1996. All faucets with heavy <br />public use will be evaluated for installation of water conservation fixtures--i.e.. spring <br />loaded or infrared sensor turn-on/turn-off features. <br />. Showers: Signs will be installed in 1996 at Sunset Pool. Centennial Pool. and the <br />Memorial Building locker rooms reminding customers to turn off showers. A <br />comprehensive cost/benetit analysis will be conducted of a total retrofit of the public <br />showers for installation of a low-flow fixtures. mixing valves (to control temperature). and <br />an infrared sensor or spring loaded system to turn the showers off and on. The <br />recommended retrofit will be installed within the estimated 2-3 year payback period. <br />. New construction: Low water use plumbing fixtures will be installed in all new <br />construction. <br /> <br />10 <br />