My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
San Miguel Demo Garden Contract
CWCB
>
Water Conservation
>
Backfile
>
San Miguel Demo Garden Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2011 1:04:23 PM
Creation date
9/30/2006 9:01:44 PM
Metadata
Fields
Template:
Water Conservation
Project Type
Ag/Muni Grant
Contract/PO #
C153665
Applicant
San Miguel County
Project Name
Xeriscape Demonstration Garden
Title
Contract
Date
12/1/1993
County
San Miguel
Water Conservation - Doc Type
Contract
Document Relationships
San Miguel Demo Garden Applic
(Message)
Path:
\Water Conservation\Backfile
San Miguel Demo Garden Final Report
(Message)
Path:
\Water Conservation\Backfile
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />r--" <br /> <br />. <br /> <br /> <br />CONTRACT ROUTING NUMBER <br /> <br /> <br />CONTRACT <br /> <br />THIS CONTRACT, made this ~ day of December 1993, by and between the State of Colorado for the use and benefit of rue Department of <br />Natural Resources. Colorado Water Conservation Board, 1313 Sherman St. Room 721. Denver. Colorado 80203 hereinafter referred to as the Stale, and ~ <br />San MiRtlel County, P.D, Box 548. Telluride, Colorado. 81435, hereinafter referred to as the Contractor. <br /> <br />WHEREAS, authority exists in the Law and Funds have been budgeted. appropriated and O{herwise made available and a sufficient unencumbered <br />balance there of remaios available for payment in Agency PDA, Fuod Number 424. Organization 92YY, Appropriatioll Code 100, Program WfRC, Object Code <br />5110, Sub Object Code 20, Contract Encumbrance Number (! /5 3&'5 ; and <br /> <br />WHEREAS. required approval. clearance and coordination has been accomplished from and with appropriate agencies; and <br /> <br />WHEREAS, the State desires to assist public agencies, established under Colorado law, for the purpose of a pilot program demonstrating me <br />benefits of water efficiency measures by providing incentive grants pursuant to the authority granted in Section 37-60-125, CRS; and <br /> <br />WHEREAS, the ContraClor's application f{)f a grant from the Water Conservation Board Construction Fund has been recei.ved and approved by <br />the Colorado Watel" Conservation Board; and <br /> <br />WHEREAS, Ihe Colorado Water Conservation Board desires to distribute said funds pursuant to law; and <br /> <br />WHEREAS. Ihe Conlracror is an eligible public agency to receive grant assistance from Ihe Pilol Program for demonstrating the benefits of water <br />efficiency measures. <br /> <br />NOW THEREFORE it is hereby agreed that: <br /> <br />1, Area Covered, The Contractor shall perform and accomplish all the necessary work and services jXovided under this Contract, as described <br />in lhe attached Exhibit A. whim is incorporated herein and made part of lhis Contract by reference, <br /> <br />2, Scope of Services In consideration for the monies (0 be received from the State, the Contractor shan do, perform. and carry out, in a <br />satisfactory and proper manner, as detennined by the State, all work elements as indicated in the "Scope of Services", set forth in the attacbed Exhibit A. <br />hereinafter referred to as the "Project" and incDflXlrated herein. Work performed prior to the exerution of this Contract shall nol be considered part of lhis Project. <br /> <br />3. Responsible Administra~or. The performance of the services required. hereunder shall be under me direct supervision of April Montl!.omcr'{ , <br />an employee or agent of Contractor, who is hereby designated as the administrator-in-charge of this Project. If At any time the administrator-in-charge changes <br />the Board must be given written notice of the change and must approve the replacement before any further monies are distributed, <br /> <br />4. Time of Perfonnance, lhis Contract shall become effective upon proper execution of this Contract by the State Controller or his designee, <br />The Project contemplated herein shall commence as soon as practicable after the execution of this Conlract and shall be undertaken and performed in lhe sequence <br />set forth in the "Time of Performance" in the atlached Exhibit A. Expenses incWTed by the Contractor in association with said Project prior to execution of thjs <br />Contract shall not be eligible expenditures. The Contractor agrees that time is of the essence in the performance of its obligations under this Contract, and that <br />completion of the Project shall occur no later than the termination date set forth in the Time of Perfonnance in Exhibit A. <br /> <br />5. Compensation and Method of Payment. The State agrees to pay to the Contractor, in consideration for the work and services (0 be performed, <br />a total amount not to exceed EIGHT THOUSAND AND NO/IOO Dollars ( $8,000). The method and time of payment shall be made in accordance with the <br />"Payment Schedule" set forth in Exhibil A. <br /> <br />Page I of 6 pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.