Laserfiche WebLink
<br />C. Existing Water Conservation Measures In Place: <br />None <br /> <br />D. Potential For Water Conservation Upgrade: <br />None <br /> <br />5. GGCC/CBI Domestic Water System <br /> <br />A. Description of Operation: Water main pressures <br />are sufficient to supplv whole buildinq without <br />pump to boost pressure. <br /> <br />B. System Leakage Assessment: Svstem is monitored <br />dailv. leaks are reported auicklv. as are repairs. <br /> <br />C. Existing Water Conservation Measures In Place: <br />Water-Mizer replacement parts in valves ensure <br />proper minimal flow for sanitarv flushes. <br /> <br />D. Potential For Water Conservation Upgrade: <br />Constant monitorinq. reportinq of leaks. water- <br />mizer replacement parts. <br /> <br />6. Executive Mansion Heating/Cooling System <br /> <br />A. Description of Operation: Gas fired heatinq of hot <br />water for buildinq heat and DX coolinq of chilled <br />water. <br /> <br />B. <br /> <br />system Leakage Assessment: <br /> <br />o <br />