My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Italian Creek ISF Proposal with Attachments 10-27-21
CWCB
>
Instream Flow Appropriations
>
DayForward
>
3001-4000
>
Italian Creek ISF Proposal with Attachments 10-27-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2023 8:03:46 PM
Creation date
1/4/2023 12:54:13 PM
Metadata
Fields
Template:
Instream Flow Appropriations
Case Number
22/4/A-003
Stream Name
Italian Creek
Watershed
East Taylor
Water Division
4
Water District
59
County
Gunnison
Year
2022
Instream Flow App - Doc Type
Supplemental Data
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 5.6 2.1 0.1 2.38 <br /> 16.1 2.15 0.15 1.17 <br /> 16.6 2.1 0.1 0.46 <br /> 17.3 2.2 0.2 1.47 <br /> 17.8 2.3 0.3 0.76 <br /> 18.3 2.3 0.3 2.23 <br /> 18.8 2.4 0.4 1.74 <br /> 19.3 2.3 0.3 1.45 <br /> 19.7 2.4 0.4 1.27 <br /> 20.2 2.1 0.1 1.26 <br /> Waterline 21 2 0 0 <br /> Bankfull 21.3 1.8 <br /> 21.5 1.6 <br /> 22 1.35 <br /> 22.5 1 <br /> Cross-section for Italian Creek-07/06/2020 XS 2 <br /> 0 <br /> 0.5 <br /> 2 <br /> 0� 2 <br /> 2.5 <br /> 3 <br /> 5 10 15 <br /> Station(ft) <br /> Channel Bed + Water Surface • Bankfull Waterl-iie <br /> R2Cross RESULTS: Italian Creek-07/06/2020 XS 2, Analysis Method: [Manning's n] <br />
The URL can be used to link to this page
Your browser does not support the video tag.