My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Italian Creek ISF Proposal with Attachments 10-27-21
CWCB
>
Instream Flow Appropriations
>
DayForward
>
3001-4000
>
Italian Creek ISF Proposal with Attachments 10-27-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2023 8:03:46 PM
Creation date
1/4/2023 12:54:13 PM
Metadata
Fields
Template:
Instream Flow Appropriations
Case Number
22/4/A-003
Stream Name
Italian Creek
Watershed
East Taylor
Water Division
4
Water District
59
County
Gunnison
Year
2022
Instream Flow App - Doc Type
Supplemental Data
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FIELD DATA <br /> Feature Station Rod Height Water depth Velocity <br /> (ft) (ft) (ft) (ft/s) <br /> 2.1 0.65 <br /> 3 0.75 <br /> 4 0.95 <br /> 4.5 1.2 <br /> 4.8 1.4 <br /> Bankfull 5 1.6 <br /> 5.5 2.5 <br /> Waterline 6 2.6 <br /> 7 2.9 0.15 0.07 <br /> 8 2.95 0.2 0.12 <br /> 9 2.95 0.25 0.7 <br /> 9.7 2.9 0.2 0.33 <br /> 10.5 2.9 0.2 1.77 <br /> 11 2.9 0.2 1.68 <br /> 11.5 3 0.3 1.71 <br /> 12 2.9 0.2 1.35 <br /> 12.7 2.95 0.25 1.07 <br /> 13.7 3 0.3 1.22 <br /> 14.2 3 0.3 0.89 <br /> 14.7 3.1 0.4 0.31 <br /> 15.2 3.2 0.5 0.72 <br /> 15.7 3.2 0.5 0.47 <br /> 16.2 3.1 0.4 1.82 <br /> 16.5 3.2 0.5 1.75 <br /> 16.8 3.2 0.5 2.08 <br /> 17 3.3 0.6 2.74 <br /> 17.2 3.3 0.6 2.56 <br /> 17.5 3.3 0.6 1.77 <br /> 17.7 3.3 0.6 1.58 <br /> 18 3.3 0.6 2.19 <br /> R2Cross RESULTS: Italian Creek-06/25/2020 XS 1, Analysis Method: [Manning's n] <br />
The URL can be used to link to this page
Your browser does not support the video tag.