My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Italian Creek ISF Proposal with Attachments 10-27-21
CWCB
>
Instream Flow Appropriations
>
DayForward
>
3001-4000
>
Italian Creek ISF Proposal with Attachments 10-27-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2023 8:03:46 PM
Creation date
1/4/2023 12:54:13 PM
Metadata
Fields
Template:
Instream Flow Appropriations
Case Number
22/4/A-003
Stream Name
Italian Creek
Watershed
East Taylor
Water Division
4
Water District
59
County
Gunnison
Year
2022
Instream Flow App - Doc Type
Supplemental Data
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ANALYSIS RESULTS <br /> Habitat Criteria Results <br /> Bankfull top width (ft) = 15.0 <br /> Habitat Criteria Discharge (cfs) Meeting Criteria <br /> Mean Depth(ft) 0.2 2.41 <br /> Percent Wetted Perimeter(%)** 50.0 1.285 <br /> Mean Velocity(ft/s) 1.0 2.58 <br /> **Values highlighted in yellow indicate that the discharge is less than 40%of measured Q or greater <br /> than 250%of measured Q. <br /> Italian Creek - 06/25/2020 XS 1 <br /> a) <br /> Ai <br /> N <br /> �3 <br /> a) 5+ <br /> w 25 <br /> U <br /> d <br /> 21 10 2'0 K 40 50 6a <br /> Discharge (cfs) <br /> R2Cross RESULTS: Italian Creek-06/25/2020 XS 1, Analysis Method: [Manning's n] <br />
The URL can be used to link to this page
Your browser does not support the video tag.