My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lottis Creek ISF Proposal with Attachments 10-27-21
CWCB
>
Instream Flow Appropriations
>
DayForward
>
3001-4000
>
Lottis Creek ISF Proposal with Attachments 10-27-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2023 8:05:25 PM
Creation date
1/4/2023 12:18:04 PM
Metadata
Fields
Template:
Instream Flow Appropriations
Case Number
22/4/A-002
Stream Name
Lottis Creek
Watershed
East River
Water Division
4
Water District
59
County
Gunnison
Year
2022
Instream Flow App - Doc Type
Supplemental Data
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table 2. 112CROSS analysis summary and preliminary summer instream flow recommendation, no proposed <br /> change to the winter flow rate. <br /> Bankfull Winter Flow Summer Flow <br /> Cross Section Measured Top 1 Z <br /> (Date) Discharge(cfs) Width Recommendation Recommendation <br /> (cfs) (cfs) <br /> (ft) <br /> Lottis Creek#1 13.85 22.3 Out of range 5.7 <br /> (7-21-20) <br /> Lottis Creek#2 9.66 22.1 Out of range 8.5 <br /> (9-13-20) <br /> Proposed ISF Rate: 5 cfs 7.1 <br /> (no proposed change) <br /> 1) The proposed dates for the winter flow rate are November 1 to March 31. <br /> 2) The proposed dates for the summer flow recommendation are April 1 to October 31. <br />
The URL can be used to link to this page
Your browser does not support the video tag.