Laserfiche WebLink
Table 2. 112CROSS analysis summary and preliminary instream flow recommendations. <br /> Bankfull Winter Flow Summer Flow <br /> Cross Section Measured Top Recommendation Recommendation <br /> (Date) Discharge(cfs) Width (2 of 3 criteria) (3 of 3 criteria) <br /> (ft) (cfs) (cfs) <br /> Cameron Creek#1 <br /> 1.96 5.7 0.75 0.87 <br /> (7-5-21) <br /> Cameron Creek#2 <br /> 0.52 5.7 0.52 1.42 <br /> (9-17-21) <br /> Proposed ISF Rate: 0.64 cfs 1.1 cfs <br /> Following further analysis,the preliminary instream flow rates and seasons were revised based upon <br /> water availability to create the following instream flow seasons and rates: <br /> • April 1 to September 30: 1.1 cfs <br /> • October 1 to October 31:0.64 cfs <br /> • November 1 to March 31:0.5 cfs* <br /> *Water availability limited, R2Cross output reduced to be consistent with physical water <br /> availability. <br />