My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CrossCreek2022HCCA
CWCB
>
Instream Flow Appropriations
>
DayForward
>
3001-4000
>
CrossCreek2022HCCA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2023 8:01:51 PM
Creation date
1/4/2023 11:35:04 AM
Metadata
Fields
Template:
Instream Flow Appropriations
Case Number
23-A-001
Stream Name
Cross Creek
Watershed
Taylor River
Water Division
4
County
Gunnison
Year
2023
Instream Flow App - Doc Type
Supplemental Data
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table 2. 112CROSS analysis summary and preliminary instream flow recommendations. <br /> Bankfull Summer Flow <br /> Winter Flow <br /> Cross Section Measured Top Recommendation <br /> Date Dischargecfs Width (2 of 3 criteria) <br /> (Date) (cfs) (cfs) (3 of 3 criteria) <br /> (ft) (cfs) <br /> Cross Creek#1 <br /> 1.41 7.7 0.97 1.4 <br /> (6-28-21) <br /> Preliminary Proposed ISF Rate: 0.85* 1.4 <br /> Following further analysis,the preliminary instream flow rates and seasons were revised based upon <br /> water availability to create the following instream flow seasons and rates: <br /> • April 1 to April 30:0.72 cfs* <br /> • May 1 to July 31: 1.4 cfs <br /> • August 1 to August 31:0.85 cfs* <br /> • September 1 to September 30:0.63 cfs* <br /> • October 1 to March 31:0.27 cfs* <br /> *Water availability limited, R2Cross output reduced to be consistent with physical water <br /> availability. <br />
The URL can be used to link to this page
Your browser does not support the video tag.