Laserfiche WebLink
<br />~ <br /> <br />.~ <br /> <br />feet along a bearing of S 800 W rrom <br />the Northeast corner of the BE 1/4 of <br />the NW 1/4 of Secti.on 18, Runge B 6 ~.;rQst, <br />'J'uwnship 12 South (unsurveyed). <br />4. Source of water (river and tributary): <br />(A) l\SARCO Pipeline No.1: Intermitt.ent strcam <br />clr<1,ining Galena Lake, tributary to Crystal <br />River. <br />(E) ABARCO Pipeline No.2: Rock Cro0.k (also <br />known as West Fork of South Fork of Crystal <br />River), tributary to Crystal River.. <br />S-A. Date of initiation of appropriations: <br />(A) ASl\RCO Pipeline No.1: August 23, 1979. <br />(E) ABARCO Pipeline No, 2: Au~ust 30, 1979. <br />5-B. Do1:o water rjxst applied to beneficial use: <br />Not applicable. <br />5-C. IJow ,lppropr:iiltion was initiated: <br />A8ARCO Incorporated formed an intention to appropriate <br />water for all beneficial uses in conncci.:,lon with <br />minc:r.ill 0xploration and m,in_ing on it.s Galena Mountain <br />Project as set forth in Parargraph 7 below in early <br />1979, filing a Plan of Operations for the project with <br />the U.B. Forest Service on February 22, 1979. ABARCO <br />Incorporated manifested this intent upon the land by <br />locatjllg diversion sites on August 23 lltld 30, 1979, <br />making preliminary diversions from the strearrs here <br />involved, and using such water for initial Diamond <br />Drill.ing Operations in connection with ils minora I <br />exploration and mining operations on the Galena <br />Mountain Project. <br /> <br />6. Amount of water claimed: <br /> <br />(A) ASARCO Pipeline No.1: <br />(B) ABARCO Pipeline No.2: <br /> <br />.009282 cfs (6,000 gpd). <br />.611065 cfs (395,000 gpd). <br /> <br />-2- <br /> <br />. '. <br /> <br />I <br />