Laserfiche WebLink
<br />~ <br /> <br />fnet a].0119 a bearjng of S 800 w rrom <br />the Northeast cornel" of the SE 1/4 of <br />i.he NW 1/4 of Sect.ion 1$, R'lf"t(J(~ 86 Nest, <br />'J'uwnship 12 South (unsu:cveyed). <br />4. SOUl.-ce of water (river and tributary): <br />(A) ASARCO Pipeline No.1: Intermittent stream <br /><lr...in.i.ng Galena Lake, -tt"ibut<1ry to Crystal <br />R.iver. <br />(E) ASARCO Pipeline No.2: Rock Cr00k (also <br />known as West Fork of South Fo.rk of Crystal <br />r~iver), tributary 1.0 C"r.ys-tal lhvlJr. <br />5-A. Date of j~itiQtion of appropriations: <br />(AI ARARCO Pipeline No.1: nugust 23. 1979. <br />(BI ^S^RCO Pipeline NO.2: nugust 30. 1979. <br />5-B. Dn1:e water fj]-st applied to bcnor'ic~al use: <br />Not applicable. <br />S-C. How ,:~pprop).-:i;l"l:;.on was initiated: <br />ASARCO Incorporated .formed an intention to appropriate <br />water for all beneficial uses in connection with <br />mincr~l 0xploration and minin~ on its Gulena Mountain <br />Project as set forth in Parargraph 7 below in early <br />1979, j:j.ling a Plan of Operations for the project with <br />t:he LJ. S. Forest Service on February 22 I 1979. ASARCO <br />InCOn'()l..~tcd manifested th:i.s intent upun the land by <br />locatjng diversion sites on JI.ugust 23 ilnd 30, 1979, <br />making preliminary G.i.vers.i.ons :from the streaJTlS hero <br />involv(~d, and using such water .for initi,,,l Dinnlond <br />DrilJ,jng Operations in COJlnectjon with iLs mineral <br />uxplul','ll: ion and mining Op(~l"i.-ltions on the Galena <br />Mount.il.i.n Project. <br /> <br />6. i\.mounL of water claimed: <br /> <br />(A) ASAHCO Pipeline No.1: <br />(B) At-iA]<CO Pipeline No.2: <br /> <br />.009282 cfs (6,000 gpd). <br />.611065 cfs (395.000 gpd). <br /> <br />-2- <br /> <br />. ' <br /> <br />I <br /> <br />- <br />