Laserfiche WebLink
<br />l~I,!'t"~ <br /> <br />t}1l~~ <br />~.:~~ <br />" .... <br />l.,":"l;'2ik'<;",''ii<:'{1'l <br />W"-'~v,",'-i9!!.~....l..'('''Il <br />t~. <br />r;2'Ai~~1 <br /> <br />.~. 10 <br />f-'-'-:'-~~3:']j~\-;'t;-,-'i, ;~~ <br />t _.,."nM_' II <br />h o.~lli-. J <br />~"'" ....-; 12 <br />t -, ~~_'~~,... <br />~ - ',,c; "] 13 <br />\ __"",,,,,7f! <br />... \<..~",'J:~b <br /> <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br /> <br />2 <br />3 <br /> <br />intends to rely on to the extent such records exist. In the case of <br /> <br /> <br />appl;cat;oI15 AN APPLICATION FOR APPROVAL OF A WATER BANK CHARTER <br /> <br /> <br />THAT HAS BEEN GRANTED PURSUANT TO SECTION 37-60-131 OR that will <br /> <br />4 <br /> <br />require construction of a well, other than applications for determinations <br /> <br />5 <br /> <br />of rights to ground water from wells described in section 37-90-137 (4). <br />no application shall be heard on its merits by the referee or water judge <br />until a written consultation report, as required by subsection (4) of this <br />section, has been submitted and considered, The consultation report shall <br />be submitted within four months after the filing of the application and <br />shall include findings as to whether the construction and use of any well <br />proposed in the application will injuriously affect the owner of, or persons <br />entitled to use, water under a vested water right or decreed conditional <br />water right OR WHETHER OPERATION OF A WATER BANK PURSUANT TO ITS <br /> <br />6 <br /> <br />7 <br /> <br />8 <br /> <br />9 <br /> <br />14 <br /> <br />CHARTER IS LIKELY TO ENSURE THAT THERE WILL BE NO INJURIOUS EFFECT <br /> <br />ON THE OWNER OF OR PERSONS ENTITLED TO USE WATER UNDER A VESTED <br /> <br />WATER RIGHT OR A DECREED CONDITIONAL WATER RIGHT, In the case of <br /> <br />applications for determinations of rights to ground water from wells <br /> <br /> <br />described in section 37.90.137 (4), the application shall be supplemented <br /> <br /> <br />by evidence that the state engineer has issued or failed to issue, within <br /> <br /> <br />four months ofthe filing of the application in water court, a determination <br /> <br /> <br />as to the facts of such application, Such state engineer's determination <br /> <br /> <br />shall be made by the state engineer upon receipt from the water clerk of <br /> <br /> <br />a copy of the application, and no separate filing or docketing with the <br /> <br /> <br />state engineer shall be required, <br /> <br /> <br />(II) FORMS FOR APPROVAL OF A WATER BANK CHARTER SHALL <br /> <br />REQUIRE SUBMISSION OF THE FOLLOWING INFORMATION: <br /> <br />(A) A LIST OF THE GOVERNMENTAL ENTITIES THAT CONSTITUTE THE <br /> <br />.11- <br /> <br />SBOI-161 <br />