Laserfiche WebLink
<br />C 4 <br /> <br />L 5 <br /> <br />7 <br /> <br />8 <br /> <br />9 <br /> <br />10 <br /> <br />Ish <br />Reservoir <br /> <br />'" <br />.' <br /> <br />36,000 <br /> <br />20 <br /> <br />57,773 <br /> <br />R.C. Pipe <br />Siphon <br /> <br />16,050 <br /> <br />40 <br /> <br />37,416 <br /> <br />6 <br /> <br />Lake <br />Loveland <br />Outlet <br />Works* <br /> <br />582,800 <br /> <br />250,000 <br /> <br />40 <br /> <br />Durango <br />West Water <br />Supply <br />Project <br /> <br />408,000 <br /> <br />40 <br /> <br />951,130 <br /> <br />Onion <br />Va 11 ey <br />Dam** <br /> <br />300,000 <br /> <br />40 <br /> <br />699,360 <br /> <br />DeWeese Dye <br />Ditch* <br /> <br />106,000 <br /> <br />40 <br /> <br />247,107 <br /> <br />Moonlight <br />Lateral* <br /> <br />100,000 <br />$9,887,550 <br /> <br />40 <br /> <br />233,120 <br />$19,588,350 <br /> <br />Totals <br /> <br />*The moneys for this project shall not be made available <br />by the board until the board has, in its sole discretion, <br />determined that the project is technically and finaneially <br />feasible. <br /> <br />**The board may loan up to $300,000 based on project <br />sponsors' financial need. The moneys for this project shall <br />not be made available by the board until the board has, in its <br />sole discretion, determined that the project is technically <br />and financially feasible. <br /> <br />(2) The Colorado water conservation board may make loans <br />for the construction of each project specified in subseetion <br />(1) of this section from such moneys as are or may hereafter <br />become available to the Colorado water eonservation board <br />construction fund, said loans to be in the amounts listed in <br />said subsection (1) plus or minus such amounts, if any, as may <br />be justified by reason of ordinary fluetuations in <br />construction costs as indicated by the engineering cost <br />indices applicable to the types of construction involved for <br />such projects or as may be justified by reason of changes made <br />in the plans for a project if those changes are required by <br />final engineering drawings and specifications or by federal or <br />state requirements. The board's loan for any project <br /> <br />'":-- <br /> <br />PAGE 2-SENATE BILL NO. 30 <br />