Laserfiche WebLink
<br /> Repayment .~ <br /> Projeet Board Period Total <br /> Priority Name Loan (Years) Repayment <br /> 1 Canon Heights <br /> Canals $ 65,500 25 $ 116,180.25 <br /> 2 Alsbury Dam 35,000 20 56,168.00 <br /> 3 Coon Creek <br /> Reservoirs 55,000 25 97,556.25 <br />j 4 Juniata <br /> Pipeline 250,000 25 443,437.50 <br /> 5 Barnes Meadow <br /> Dam 215,000 20 345,032.00 <br /> 6 Redlands <br /> Rehabilitation" 420,000 40 979 ,104.00 <br /> Totals $1.040,500 $2,037,478.00 <br /> <br />.*The moneys for this projeet shall not be made available by <br />the board until the board has, in its sole discretion, <br />determined that the project is technically and financially <br />feasible. <br /> <br />, J <br /> <br />(2) The Colorado water conservation board shall make <br />loans for the eonstruction of each project specified in <br />subsection (1) of this section from such moneys as are, or may <br />hereafter become, available to the Colorado water conservation <br />board construction fund. The board shall not disperse any <br />moneys for any loan authorized by subsection (1) of this <br />section until it is satisfied, in its sole discretion, that <br />the recipient of any such loan will be able to make repayment <br />pursuant to the terms and eonditions established by the board <br />and by subsection (1) of this seetion. Said loans shall be in <br />the amounts listed in subsection (1) of this section plus or <br />minus such amounts, if any, as may be justified by reason of <br />ordinary fluctuations in construetion costs as indicated by <br />the engineering cost indices applicable to the types of <br />construetion required for eaeh project or as may be justified <br />by reason of changes made to the plans for a projeet if those <br />changes are required by final engineering drawings and <br />specifications or by federal or state requirements. The <br />board's loan for eaeh project specified in subsection (1) of <br />this section shall be for fifty percent of the total <br />construction eost of a project. . <br /> <br />(3) Contracts entered into by the Colorado water <br />conservation board pursuant to section 37-60-119 (2), Colorado <br /> <br />" <br />, <br /> <br />PAGE 2-5ENATE BILL NO. 85 <br />