Laserfiche WebLink
<br />Ch. 168 <br /> <br />Water and Irrigation <br /> <br />(I) <br /> <br />Agricultural Ditch and Reservoir <br />Co. - Welch Ditch Pump and <br />Pipeline' <br /> <br />$ 300,000 <br /> <br />(g) <br /> <br />Hawkeye Lateral Ditch <br />Company - Ditch Rehabilitation <br /> <br />Weldon Valley Ditch Company <br />- Diversion Dam Rehabilitation <br /> <br />$ 143,000 <br /> <br />(h) <br /> <br />$ 188,000 <br /> <br />(I) <br /> <br />Pine River Irrigation District - <br />Raw Water Supply System <br /> <br />$ 341,000 <br /> <br />(j) <br /> <br />River Oaks on the Roaring Fork <br />Property Owners Assoc, - <br />Raw Water Irrigation System' <br /> <br />$ 25,500 <br /> <br />(k) <br /> <br />UpperYampa Water <br />Conservancy District - Stagecoach <br />Reservoir Refinancea <br /> <br />$2,000,000 <br /> <br />(I) <br /> <br />Powderhorn Metro District I <br />Utility Enterprise - Robbins <br />Reservoir Rehabilitation <br /> <br />$ 525,000 <br /> <br />(m) <br /> <br />Pinon Mesa Ranches' - <br />Diversion Structure, Raw <br />Water Pipeline and Storage <br /> <br />$ 206,000 <br /> <br />(n) <br /> <br />San Luis Valley Canal Co. - <br />Diversion Structure <br />Rehabilitation <br /> <br />$ 188,000 <br /> <br />(0) <br /> <br />Purgatoire River Water <br />Conservancy District - <br />Trinidad Project <br />Refinance <br />TOTAL <br /> <br />$ 500,000 <br /> <br />$5,804,500 <br /> <br />a Loan to refinance a water project wholly or partially completed. <br /> <br />(2) The Colorado water conservation board may make loans for the construction <br />of the projects specified in subsection (I) of this section from such moneys as are or <br />may hereafter become available to the Colorado water conservation board <br />construction fund. Said loans shall be in the amounts listed in subsection (I) of this <br />section plus or minus such amounts, if any, as may be justified by reason of ordinary <br />fluctuations in construction costs as indicated by the engineering cost indices <br />applicable to the types of construction required for each project or as may be justified <br />by reason of changes in the plans for a project due to differing or unforseen site <br />conditions, errors or omissions in the plans and specifications, changes instituted by <br />