My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LEG00105
CWCB
>
Legislation
>
Backfile
>
LEG00105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2009 11:40:20 AM
Creation date
9/30/2006 8:11:35 PM
Metadata
Fields
Template:
Legislation
Bill Number
SB03-085
Year
2003
Title
Temporary Loan of Water Rights
Legislation - Doc Type
Other CWCB Related Bills - Passed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br /> <br />e <br /> <br />e <br /> <br />NECESSARY TO ENSURE THA TTHESE STANDARDS ARE MET. IN MAKING THE <br />DETERMINATIONS SPECIFIED IN THIS PARAGRAPH (f). THE DIVISION <br />ENGINEER SHALL NOT BE REOUIRED TO HOLD ANY FORMAL HEARINGS OR <br />CONDUCT ANY OTHER FORMAL PROCEEDINGS. BUT MAY CONDUCT A <br />HEARING OR FORMAL PROCEEDING IF THE DIVISION ENGINEER FINDS IT <br />NECESSARY TO ADDRESS THE ISSUES. <br />(4) THE DIVISION ENGINEER SHALL APPROVE OR DENY THE <br />PROPOSED LOAN WITHIN TWENTY DAYS AFTER THE DATE OF MAILING OF <br />NOTICE UNDER PARAGRAPH (b) OF SUBSECTION (3) OF THIS SECTION. OR <br />WITHIN FIVE DAYS AFTER THE APPLICANT PROVIDES EVIDENCE THAT ALL <br />PERSONS ENTITLED TO SUCH NOTICE HAVE EITHER CONSENTED TO OR <br />COMMENTED ON THE APPLICATION. WHICHEVER IS EARLIER_ <br />(5) WHEN THE DIVISION ENGINEER APPROVES OR DENIES A <br />PROPOSED LOAN. THE DIVISION ENGINEER SHALL SERVE A COPY OF THE <br />DECISION ON ALL PARTIES TO THE APPLICATION BY FIRST-CLASS MAIL OR. <br />IF SUCH PARTIES HAVE SO ELECTED. BY ELECTRONIC MAIL. NEITHER THE <br />APPROVAL NOR THE DENIAL BY THE DIVISION ENGINEER SHALL CREATE <br />ANY PRESUMPTIONS, SHIFT THE BURDEN OF PROOF. OR SERVEASADEFENSE <br />IN ANY LEGAL ACTION THAT MAY BE INITIATED CONCERNING THE LOAN_ <br />ANY APPEAL OF A DECISION BY THE DIVISION ENGINEER CONCERNING THE <br />LOAN PURSUANT TO THIS SECTION SHALL BE MADE TO THE WATER JUDGE <br />IN THE APPLICABLE WATER DIVISION WITHIN FIFTEEN DAYS AFTER THE <br />DATE ON WHICH THE DECISION IS SERVED ON THE PARTIES TO THE <br />APPLICATION. THE WATER JUDGE SHALL HEAR SUCH APPEAL ON AN <br />EXPEDITED BASIS. <br />(6) LOANS OF WATER RIGHTS UNDER THIS SECTION SHALL BE <br />LIMITED TO NO MORE THAN ONE HUNDRED EIGHTY DAYS DURING ANY ONE <br /> <br />-5- <br /> <br />085 <br />
The URL can be used to link to this page
Your browser does not support the video tag.