My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LEG00104
CWCB
>
Legislation
>
Backfile
>
LEG00104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2009 11:40:20 AM
Creation date
9/30/2006 8:11:35 PM
Metadata
Fields
Template:
Legislation
Bill Number
SB99-173
Year
1999
Title
Concerning the Funding of Colorado Water Conservation Board Projects and Making Appropriations in Connection Therewith
Legislation - Doc Type
Construction Fund Bill
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Water and Irrigation <br /> <br />Ch.2I8 <br /> <br />(e) <br /> <br />Leroux Creek Water Users <br />Association - Carl Smith Reservoir <br />Dam Rehabilitation <br /> <br />$ 1,250,000 <br /> <br />(I) <br /> <br />Consolidated Mutual Water <br />Company - Fortune Reservoir <br /> <br />$ 10,000,000 <br /> <br />(g) <br /> <br />Pine River Canal Company. <br />Tunnel Hill Proiect <br /> <br />$ 243,700 <br /> <br />Total <br /> <br />$ 12,460,033 <br /> <br />, This loan is to refinance a water project wholly or partially completed. <br /> <br />(2) The Colorado water conservation board may make loans for the construction <br />of the projects specified in subsection (I) ofthis section from such moneys as are or <br />may hereafter become available to the Colorado water conservation board <br />construction fund. Said loans shall be in the amounts listed in subsection (I) of this <br />section plus or minus such amounts, if any, as may be justified by reason of ordinary <br />fluctuations in construction costs as indicated by the engineering cost indices <br />applicable to the types of construction required for each project or as may bejustified <br />by reason of changes in the plans for a project due to differing or unforeseen site <br />conditions, errors or omissions in the plans and specifications, changes instituted by <br />regulatory agencies, or changes in material quantities beyond contract limits. <br /> <br />(3) Pursuant to section 37-60-120 (1), Colorado Revised Statutes, the board shall <br />require such tenns and conditions in such contracts as will ensure repayment offunds <br />made available by it. The board shall not disburse any moneys for any loan <br />authorized by subsection (I) of this section unless and until it is satisfied, at its sole <br />discretion, that the recipient of any such loan will be able to make repayment <br />pursuant to the tenns and conditions established by the board and by subsection (I) <br />of this section. <br /> <br />SECTION 2. Water project loan authorizations from the severance tax <br />trustfuud perpetual base account. (1) Pursuantto section 39-29-109 (I) (a) (1), <br />Colorado Revised Statutes, the Colorado water conservation board is hereby <br />authorized to loan moneys from the severauce tax trust fund perpetual base account <br />to enable the construction of the following water resources projects with the following <br />priority: <br /> <br />(a) <br /> <br />Borrower-Project Loan Amount <br /> <br />Ute Water Conservancy District - $ 7,000,000 <br />Plateau Creek Pipeline Replacement <br />Proiect <br /> <br />Priority <br /> <br />Total <br /> <br />$ 7,000,000 <br /> <br />(2) The Colorado water conservation board may make loans for the construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.