Laserfiche WebLink
<br />, " <br /> <br />(0) A TUNNEL COMPANY AS AUTHORIZED IN SECTIONS 38-2-101, <br />38-4-101,38-4-107, AND 38-4-1 10; <br /> <br />(p) AN ELECTRIC POWER COMPANY AS AUTHORIZED IN SECTIONS <br />38-2-101,38-4-101, AND 38-4-107; <br /> <br />(q) A TRAMWAY COMPANY AS AUTHORIZED IN SECTIONS 38-4-104 <br />AND 38-4-107; <br /> <br />(r) A TELEGRAPH, TELEPHONE, ELECTRIC LIGHT POWER, GAS, OR <br />PIPELINE COMPANY AS AUTHORIZED IN SECTIONS 38-2-101 AND 38-5-105 <br />AND LIMITED BY SECTION 38-5-108; AND <br /> <br />(s) A PERSON, COMPANY, CORPORATION, OR ASSOCIATION THAT HAS <br />BEEN GRANTED AN ELECTRIC RAILROAD FRANCHISE AS AUTHORIZED IN <br />SECTION 40-24-1 02, C.R.S. <br /> <br />SECTION 2. Effective date. This act shall take effect at 12:01 <br />a.m. on the day following the expiration of the ninety-day period after final <br />adjournment of the general assembly that is allowed for submitting a <br />referendum petition pursuant to article Y, section 1 (3) of the state <br />constitution (August 9, 2006, if adjournment sine die is on May 10,2006); <br />except that, if a referendum petition is filed against this act or an item, <br />section, or part of this act within such period, then the act, item, section, or <br /> <br />PAGE 12-SENATE BILL 06-154 <br />