Laserfiche WebLink
<br />be to effectively identify the current and future development of water <br />resources, systems, and facilities benefitting the residents of EI Paso <br />county. The scope of work for the master plan shall be developed by the <br />EI Paso county water authority in consultation with EI Paso county and the <br />Colorado water conservation board. <br /> <br />(2) In addition to any other appropnanon, there is hereby <br />appropriated, out of any moneys in the Colorado water conservation board <br />construction fund not otherwise appropriated, to the Colorado water <br />conservation board for allocation to the EI Paso county water authority, the <br />sum of two hundred thousand dollars ($200,000), or so much thereof as <br />may be necessary, to prepare an EI Paso county water master plan. <br /> <br />(3) The moneys appropriated in subsection (2) of this section shall <br />remain available for the designated purposes until the project is completed. <br /> <br />SECTION 13. Restoration of emergency infrastructure repair <br />loan account balance. A total of one million four hundred seventy-five <br />thousand dollars ($1,475,000), or so much thereof as may be necessary, <br />shall be transferred on or before June 30, 2000, from the unreserved cash <br />in the Colorado water conservation board construction fund to the <br />emergency infrastructure repair loan account in order to bring the balance <br />in the emergency infrastructure repair loan account back to two million <br />dollars ($2,000,000). <br /> <br />SECTION 14. Comprehensive annual financial report - <br />appropriation. (1) The Colorado water conservation board is hereby <br />authorized to contract with a responsible independent accounting finn fOL <br />the purpose of preparing a comprehensive annual financial report of the <br />Colorado water conservation board construction fund and severance tax <br />trust fund perpetual base account and, on an as-needed basis, a performance <br />audit of the loan programs. <br /> <br />(2) In addition to any other appropnatlOn, there is hereby <br />appropriated, out of any moneys in the Colorado water conservation board <br />construction fund not otherwise appropriated, to the Colorado water <br />conservation board, the sum of two hundred thousand dollars ($200,000), <br />or so much thereof as may be necessary, to contract with an independent <br />accounting finn to annually conduct a comprehensive annual [mancial <br />report of Lhe Colorado water conservation board construction fund and <br /> <br />PAGE 9-HOUSE BILL 00-1419 <br />