Laserfiche WebLink
<br />1 NOT BE LIMITED TO, A QUANTIFICATION OF THE HISTORIC NET <br />2 CONSUMPTIVE USEOF THE = WATER RIGHT, AN ACCURATE DESCRIPTION OF <br />3 THE LAND WHERE THE WATER IS DECREED FOR USE, AND. IF THE LOANED <br />4 WATER RIGHT IS BEING USED FOR IRRIGATION. A PLAN TO PREVENT <br />5 EROSION AND BLOWING SOILS AND A DESCRIPTION OF COMPLIANCE WITH <br />6 LOCAL COUNTY NOXIOUS WEED REGULATIONS AND OTHER LAND USE <br />7 PROVISIONS. THE STATE ENGINEER SHALL IMPOSE SUCH TERMS AND <br />8 CONDITIONS AS ARE NECESSARY TO ENSURE THAT THESE STANDARDS ARE <br />9 MET, IN MAKING THE DETERMINATIONS SPECIFIED IN THIS PARAGRAPH (b), <br />10 THE STATE ENGINEER SHALL NOT BE REQUIRED TO HOLD ANY FORMAL <br />11 HEARING OR CONDUCT ANY OTHER FORMAL PROCEEDINGS, BUT MAY <br />12 CONDUCT A HEARING OR FORMAL PROCEEDING IF THE STATE ENGINEER <br />13 FINDS IT NECESSARY TO ADDRESS THE ISSUES. <br />14 (c) AN INTERRUPTIBLE WATER SUPPLY AGREEMENT APPROVED <br />15 PURSUANT TO THIS SECTION SHALL BE OPERATED ONLY: <br />16 (1) DURING A DROUGHT OR OTHER EMERGENCY DECLARED BY THE <br />17 GOVERNOR PURSUANT TO SECTION 24-32-21 04 ( 4), C,R,S"INTHECOUNTY <br />18 OF ORIGIN OR USE; AND <br />19 (II) FOR A PERIOD OF NOT MORE THAN THREE YEARS IN A TEN-YEAR <br />20 PERIOD. FOR WHICH ONLY A SINGLE APPROVAL IS REOUlRED, THE <br />21 TEN-YEAR PERIOD SHALL BEGIN WITH THE GRANTING OF SUCH APPROVAL. <br />22 (d) THE APPLICANT SHALL GIVE NOTICE BY MARCH 1 OF ANY YEAR <br />23 THAT THE OPTION IS TO BE EXERCISED TO ALL PARTIES WHO FILED <br />24 COMMENTS WITH THE STATE ENGINEER PURSUANT TO THIS SECTION: <br />25 EXCEPT THAT THE OPTION MAY BE EXERCISED AT ANY TIME DURING 2003. <br />26 (4) WHEN THE STATE ENGINEER APPROVES OR DENIES .AN <br />27 INTERRUPTIBLE WATER SUPPLY AGREEMENT, THE STATE ENGINEER SHALL <br /> <br />.5- <br /> <br />313 <br /> <br />J <br />