Laserfiche WebLink
<br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br /> <br />amounts appropriated previously for the Colorado water conservation <br /> <br />board document imaging system. The moneys appropriated in subsection <br /> <br />(1) ofthis section shall remain available for the designated purposes until <br /> <br />the project is completed. <br /> <br />SECTION 10. Colorado floodplain map modernization - <br /> <br /> <br />appropriation. (1) In addition to any other appropriation, there is <br /> <br />hereby appropriated, out of any moneys in the Colorado water <br /> <br />conservation board construction fund not otherwise appropriated, to the <br /> <br />Colorado water conservation hoard, the sum of five hundred thousand <br /> <br />dollars ($500,000), or so much thereof as may be necessary, to assist with <br /> <br /> <br />the preparation of revised and improved floodplain studies and maps for <br /> <br />communities throughout Colorado andiparticipate in federally sponsored <br /> <br />floodplain map modernization activities. <br /> <br />(2) The moneys appropriated in subsection (1) ofthis section shall <br /> <br />remain available for the designated purposes until the project is <br /> <br />completed. <br /> <br />SECTION 11. Cache La Poudre river floodway project - <br /> <br /> <br />appropriation. (1) The Colorado water conservation board is hereby <br /> <br />authorized to participate in a floodplain improvement feasibility study <br /> <br />along the Cache La Poudre river in the ,City of Greeley. The purposes of <br /> <br /> <br />the study are to define specific imprqvement projects to reduce flood <br /> <br />damage, restore the riparian environmelIt, create recreation opportunities, <br /> <br />improve water quality, and other associ!lted environmental watershed and <br /> <br />floodplain enhancements. The scope of work for the project will be <br /> <br />developed by the board in consultatiol) with the City of Greeley and the <br /> <br /> <br />United States army corps of engineers; <br /> <br />(2) In addition to any other appropriation, there IS hereby <br /> <br />-8- <br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />110 <br />