My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-083 PIF
CWCB
>
Loan Projects
>
DayForward
>
7001-8000
>
CT2015-083 PIF
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2019 2:24:21 PM
Creation date
8/13/2019 2:24:05 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-083
C150411A
Contractor Name
Denver Southeast Surburban Water and Sanitation District
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
the items therein as eligible expenses, as described above, the CWCB will pay to <br /> the BORROWER the amount set forth in the request or such portion that has been <br /> approved by the CWCB. Such payment shall be made within thirty (30) days from <br /> the CWCB's approval of each request. <br /> SECTION 10—TIME FOR PERFORMANCE <br /> PROJECT BEGINS: Upon Effective Date of this CONTRACT (the date this <br /> CONTRACT is signed by the State Controller or his designee). <br /> PROJECT END DATE: Two (2) years from the Effective Date of this CONTRACT. <br /> [THE REST OF THIS PAGE INTENTIONALLY LEFT BLANK] <br /> PAID IN RAI <br /> Appendix 1 to Loan Contract C150411A <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.