Laserfiche WebLink
Section 9—Eligible Expenses <br /> The Borrower shall initiate disbursement requests by invoice to CWCB, in a form and manner approved <br /> by CWCB. No disbursements will be made prior to the execution of this Contract by the State. The <br /> following items are eligible for loan disbursements: <br /> A. Engineering associated with the feasibility report prepared as a requiremen for this loan. <br /> B. Preparing final designs and specifications for the Project. <br /> C. Preparing bid and construction contract documents. <br /> D. Preparing environmental assessment or environmental impact state ents, and otherwise <br /> complying with the Federal National Environmental Policy Act. <br /> E. Complying with all federal,state, and local regulatory requirements, includ ng the obtaining of all <br /> required permits. <br /> F. Fish and wildlife mitigation measures required by federal, state,or local la s and regulations. <br /> G. Actual construction as called for in the design documents and in change Orders approved by the <br /> CWCB and the Borrower. <br /> H. Engineering services for construction management, including design and construction <br /> management for CWCB approved change orders. <br /> I. Interest during completion of the Project pursuant to Section 10.,of the Contract. <br /> J. Legal services for reviewing engineering services contracts, reviewing this Contract, reviewing <br /> construction contract documents, and for complying with all federal, state, and local regulatory <br /> requirements. <br /> K. Project related expenses incurred prior to the Effective Date of this Contract in accordance with <br /> the approval of this loan. <br /> Section 10—Disbursement Schedule <br /> For Project expenses: The Borrower shall prepare a periodic progress report that sets forth a <br /> statement of the Project costs expended for that period and shall forwari said statement to the <br /> CWCB.After receipt of the periodic progress report from the Borrower,and eview and acceptance <br /> of the items therein as eligible expenses, as described above,the CWCB w'll pay to the Borrower <br /> the amount set forth in the report or such portion as has been approved 'sy the CWCB. Such <br /> payment shall be made within thirty(30)days from the CWCB's approval of each progress report. <br /> Section 11 —Time for Performance <br /> Project To Begin:Upon Effective Date of this Contract(the date this Contra is signed by the State <br /> Controller or his designee). <br /> Project To End: Five(5)years from the Effective Date of this Contract <br /> or based upon the date stated within the CWCB Notice of Project Substantia Completion. <br /> II <br /> Page 3 of 3 <br /> Contract Number:CT2019-2034 <br /> Appendix 1 <br />