My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2019-2792 Contract
CWCB
>
Loan Projects
>
DayForward
>
7001-8000
>
CT2019-2792 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2019 1:38:17 PM
Creation date
7/9/2019 1:37:56 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2019-2792
Contractor Name
Arabian Acres Metropolitan District
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C. Preparing bid and construction contract documents. <br /> D. Preparing environmental assessment or environmental impact statements, and otherwise <br /> complying with the Federal National Environmental Policy Act. <br /> E. Complying with all federal,state,and local regulatory requirements,inclu g the obtaining of all <br /> required permits. <br /> F. Fish and wildlife mitigation measures required by federal, state, or local laws and regulations. <br /> G. Actual construction as called for in the design documents and in change orders approved by the <br /> CWCB and the Borrower. <br /> H. Engineering services for construction management, including desi and construction <br /> management for CWCB approved change orders. <br /> I. Interest during completion of the Project pursuant to Section 10.,of the Co tract. <br /> J. Legal services for reviewing engineering services contracts, reviewing s Contract, reviewing <br /> construction contract documents, and for complying with all federal, stat , and local regulatory <br /> requirements. <br /> K. Project related expenses incurred prior to the Effective Date of this Con ct in accordance with <br /> the approval of this loan. <br /> Section 10—Disbursement Schedule <br /> For Project expenses: The Borrower shall prepare a periodic progress r port that sets forth a <br /> statement of the Project costs expended for that period and shall forward said statement to the <br /> CWCB.After receipt of the periodic progress report from the Borrower,and eview and acceptance <br /> of the items therein as eligible expenses, as described above,the CWCB wi1 pay to the Borrower <br /> the amount set forth in the report or such portion as has been approved y the CWCB. Such <br /> payment shall-be made within thirty(30)days from the CWCB's approval of each progress report. <br /> Section 11 —Time for Performance <br /> Project To Begin:Loan Effective Date. <br /> Project To End: Five (5)years from the Effective Date of this Contract <br /> or based upon the date stated within the CWCB Notice of Project Substantial Completion. <br /> [THE REST OF THIS PAGE INTENTIONALLY LEFT BLK] <br /> Page 3 of 3 <br /> Contract Number:CT2019-2792 <br /> Appendix 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.