Laserfiche WebLink
• <br /> APPENDIX 1, PROJECT SUMMARY <br /> Loan Contract Number CT2019-2792 <br /> Section 1 —Borrower's Name <br /> Arabian Acres Metropolitan District, acting by and through the water activity enterprise <br /> Section 2—Project Description <br /> A. Description of Project: The Borrower applied to the CWCB for a to to be used for the <br /> Automatic Meter Implementation(Project), located in Teller County,at a otal estimated project <br /> cost of$400,000.00. The purpose of the Project is to improve the district's operational efficiency <br /> by upgrading its water system to improve the water meters that no longr accurately measure <br /> water flow. <br /> B. Description of Feasibility Study: Adam Somers,P.E., with Aqua Works BO, Inc. prepared the <br /> Loan Feasibility Study titled, "Colorado Water Conservation Board Lan Feasibility Study <br /> Automatic Meter Reading System Implementation," dated May 2018. Th feasibility study was <br /> prepared in accordance with CWCB guidelines and includes an analysis of alternatives, <br /> preliminary engineering, and estimated engineering costs. Based upon the feasibility report,the <br /> CWCB determined the Project to be technically and fmancially feasible. <br /> Section 3—CWCB's Authority <br /> This loan is made pursuant to the provisions of §§37-60-119 and 37- 0-120, C.R.S., which <br /> authorizes the CWCB to loan money for water projects from the CWCB Co struction Fund for the <br /> benefit of the people of the state,provided that the Borrower assures repayment of that money. <br /> Section 37-60-122(1)(b)C.R.S., authorizes the CWCB to make loans of u to $10,000,000 from <br /> the CWCB Construction Fund without prior approval from the General A embly. <br /> Section 4-Board Approval <br /> At its September 20, 2018 meeting the CWCB approved a Project an from the CWCB <br /> Construction Fund to the Borrower, in an amount up to $400,000.00 for oject Costs. CWCB's <br /> Loan Origination Fee of 1%in the amount of$4,000.00 in accordance with CWCB Policy No. 16, <br /> added to the Base Loan Amount results in a Total Loan Amount of$404,0 0.00 at an interest rate <br /> of 1.85%per annum for a repayment term of ten(10)years. <br /> Section 5—Schedule of Existing Debt <br /> As of the date of the CWCB loan approval,no other debt,backed by the 1 an security described <br /> in Section 6 below,exists. <br /> Section 6—Loan Security <br /> The Security for this loan, as evidenced by the executed Security Agreem nt(Appendix 5) and <br /> incorporated herein, shall be: (i) an irrevocable (but not exclusive)pledg to the.CWCB of the <br /> Pledged Revenues in such amount as is necessary to make each annual p ment due under this <br /> Contract, (ii)an assessment covenant; and(iii)annual financial reporting. All Loan Security <br /> shall be in accordance with CWCB Policy No. 5. <br /> Section 7—Additional Conditions and Requirements <br /> None. <br /> Page 1 of 3 <br /> Contract Number:CT2019-2792 <br /> Appendix 1 <br />