Laserfiche WebLink
STATE OF COLORADO CONTRACT <br /> NONGOVERNMENTAL LOAN CONTRACT <br /> COVER PAGE <br /> State Agency Loan Contract Number <br /> Department of Natural Resources CMS 128718 <br /> Colorado Water Conservation Board(CWCB) CT2019-3706 <br /> 1313 Sherman St,Room 718 <br /> Denver,CO 80203 <br /> Borrower's Name and Address Loan Contract Project Performance Beginning Date <br /> The Tunnel Water Company The Loan Effective Date <br /> 2319 East Mulberry Street Loan Contract Project Performance End Date <br /> Fort Collins,CO 80524-2017 Five(5)years from the Project Performance Beginning Date <br /> Entity type or upon the Project Performance End Date stated within <br /> Nongovernmental CWCB's"Notice of Project Substantial Completion." <br /> Base Loan Amount(Amount in CORE) Loan Effective Date <br /> $9,000,000.00 The Effective Date(the date the State Controller or an <br /> One Percent(1%)Loan Origination Fee authorized delegate signs this Loan Contract). <br /> $90,000.00 <br /> Total Loan Amount(Includes One Percent(1%) Loan Contract Terms <br /> Origination Fee 2.85%for thirty(30)years <br /> $9,090,000.00 <br /> Contract Authority <br /> Authority to enter into this Contract exists in§37-60-119(2), <br /> C.R.S., §37-60-120,C.R.S.,and§37-60-121,C.R.S. <br /> Project Name <br /> West Half Laramie-Poudre Tunnel Rehabilitation <br /> • <br /> Contract Purpose <br /> The purpose of this Project is to prevent future tunnel collapse and blockage by rehabilitating the existing west half of the <br /> tunnel with replacement of the existing support systems. <br /> Appendices and Order of Precedence <br /> The following Appendices are included with this Contract: <br /> 1. Appendix 1,Project Summary <br /> 2. Appendix 2,Sample Option Letter <br /> 3. Appendix 3,Promissory Note <br /> 4. Appendix 4,Resolutions <br /> 5. Appendix 5,Security Agreement <br /> 6. Appendix 6,Deed of Trust <br /> In the event of a conflict or inconsistency between this Contract and any Appendices such conflict or inconsistency shall be <br /> resolved by reference to the documents in the following order of priority: <br /> 1. Colorado Special Provisions in§26 of the main body of this Contract. <br /> 2. The provisions of the other sections of the main body of this Contract. <br /> 3. Appendix 3,Promissory Note <br /> 4. Appendix 5,Security Agreement <br /> 5. Appendix 6,Deed of Trust <br /> 6. All other Appendices • <br /> Principal Representatives <br /> For the State: For Borrower: <br /> Jonathan Hernandez,Project Manager Dennis Harmon,General Manager <br /> Colorado Water Conservation Board The Tunnel Water Company <br /> 1313 Sherman St.,Room 718 2319 East Mulberry Street <br /> Denver,CO 80203 Fort Collins,CO 80524 <br /> jonathan.hernandez@state.co.us dharmon@wtrsupply.com <br /> 303-866-3441 ext.3234 970-482-3433 <br /> Contract Number:CT2019-3706 Page I of 20 Version 0119 <br />