My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2019-3687 Contract
CWCB
>
Loan Projects
>
DayForward
>
7001-8000
>
CT2019-3687 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2019 2:13:08 PM
Creation date
5/8/2019 2:12:51 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2019-3687
Contractor Name
Central Colorado Water Conservancy District, Groundwater Management Subdistrict
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
shall have no obligation to pay the Borrower for any expense incurred before the Loan <br /> Effective Date or after the expiration or sooner termination of this Contract. <br /> B. Project Term <br /> The Parties' respective performances, of the Project, under this Contract shall commence on <br /> the Contract Project Performance Beginning Date shown on the Cover Page for this Contract <br /> and shall terminate on the Loan Contract Project Performance End Date shown on the Cover <br /> Page for this Contract unless sooner terminated or further extended in accordance with the <br /> terms of this Contract. This Project Term does not include the full repayment period for <br /> the Loan or this Contract. <br /> C. Loan Expiration Date <br /> The loan expiration date is the date on which this Contract expires. The loan expiration date <br /> is when the full repayment period for the loan ends. <br /> D. Project Extension Term - State's Option <br /> The State, at its discretion, shall have the option to extend the Project Performance End <br /> Date under this Contract under the same terms specified in the Contract (each such period a <br /> "Project Extension Term"). In order to exercise this option, the Borrower shall provide <br /> written justification to CWCB and CWCB will provide written authorization for the Project <br /> Extension Term. <br /> E. Early Termination in the Public Interest <br /> The State is entering into this Contract to serve the public interest of the State of Colorado as <br /> determined by its Governor, General Assembly, or Courts. If this Contract ceases to further <br /> the public interest of the State, the State, in its discretion, may terminate this Contract in <br /> whole or in part.A determination that this Contract should be terminated in the public interest <br /> shall not be equivalent to a State right to terminate for convenience. This subsection shall not <br /> apply to a termination of this Contract by the State for breach by Borrower, which shall be <br /> governed by §18. <br /> i. Method and Content <br /> The State shall notify Borrower of such termination in accordance with§21. The notice <br /> shall specify the effective date of the termination and whether it affects all or a portion <br /> of this Contract, and shall include, to the extent practicable, the public interest <br /> justification for the termination. <br /> ii. Obligations and Rights <br /> Upon receipt of a termination notice for termination in the public interest, Borrower <br /> shall be subject to the rights and obligations set forth in§20. <br /> iii. Payments <br /> If the State terminates this Contract in the public interest,the State shall pay Borrower <br /> an amount equal to the percentage of the total reimbursement payable under this <br /> Contract that corresponds to the percentage of Work satisfactorily completed and <br /> accepted, as determined by the State, less payments previously made. <br /> 3. DEFINITIONS <br /> The following terms shall be construed and interpreted as follows: <br /> Contract Number:CT2019-3687 Page 4 of 19 Version 0119 <br />
The URL can be used to link to this page
Your browser does not support the video tag.