Laserfiche WebLink
Section 6—Loan Security <br /> The Security for this loan, as evidenced by the executed Security Agreement(Appendix 5)and <br /> incorporated herein, shall be an irrevocable(but not exclusive)pledge,to the CWCB, of the ad valorem <br /> property tax mill levy approved at the November 2018 election in such amount as is necessary to make <br /> each annual payment due under this Contract. All Loan Security shall be in accordance with CWCB <br /> Policy No. 5. <br /> Section 7—Additional Conditions and Requirements <br /> None. <br /> Section 8—"Construction Fund Program"Procedures for Projects <br /> A. The Borrower shall employ an engineer, registered in the State of Colorado to prepare plans and <br /> specifications for the Project. <br /> B. Engineering contracts and the plans and specifications must be submitted to the CWCB staff for verification <br /> of compliance with the terms of this Contract when available prior to bidding. Any modifications, to the <br /> plans and specifications that effect changes to the construction costs must be approved in writing by CWCB. <br /> C. For plans and specifications for all jurisdictional dams and reservoirs,as defined by <br /> §37-87-105 C.R.S.,the Borrower shall provide a letter of approval from the State Engineer's Office prior to <br /> construction. <br /> D. The Borrower shall notify CWCB of the bid opening date, time and location. CWCB staff may elect to <br /> attend the bid opening. <br /> E. The Borrower shall contract for the construction of the work with responsible and capable Construction <br /> Firms,selected by the Borrower and found acceptable by the CWCB staff. CWCB must approve the award <br /> of the construction contract. <br /> F. The Borrower must provide a copy of the following construction contract documents:executed contractor's <br /> proposal, executed construction contract, executed performance bond, executed payment bond, executed <br /> notice of award, proposed notice to proceed, sample change order, and sample field order, as well as the <br /> advertisement for bid. After the CWCB staff verifies that these documents comply with the terms of this <br /> Contract,the Borrower may issue the notice to proceed to the Construction Firms. <br /> G. The Borrower shall conduct a pre-construction conference at which time the CWCB staff shall have the <br /> opportunity to review and approve the construction schedule. <br /> H. If the CWCB staff determines that the Project requires a resident inspector during construction,the Borrower <br /> shall employ an inspector who has been approved by the CWCB staff. <br /> I. The Borrower shall construct the Project in accordance with the approved plans and specifications. <br /> J. Upon completion of the Project construction,the Borrower shall provide as-built drawings of the Project to <br /> the CWCB staff,or, if required by §37-87-105,C.R.S.,the Borrower shall provide the <br /> as-built drawings to the State Engineer's Office for approval and filing. <br /> K. Upon completion of the Project construction, the Borrower shall arrange a final inspection for the CWCB <br /> staff. <br /> L. The Borrower shall pay all of the expenses related to the Project when such bills are due. <br /> Page 2 of 3 <br /> Contract Number:CT2019-3687 <br /> Appendix 1 <br />