Laserfiche WebLink
undue hardship to the BORROWER and approved a loan to the BORROWER from the Small Project • <br /> Loan Account of up to $100,000 at an interest rate of 3.75% per annum for a duration of 20 years. <br /> 10. The STATE now desires, by this contract, to loan money to the BORROWER for this PROJECT upon <br /> mutually agreeable terms and conditions. <br /> THEREFORE, in consideration of the mutual and dependent covenants contained herein, the <br /> parties agree as follows: <br /> A. The BORROWER agrees as follows: <br /> 1. Construction Fund Program Procedures. The following items are procedures the BORROWER <br /> shall follow during the construction phase of the PROJECT. <br /> a. The BORROWER shall employ an engineer, registered in the State of Colorado, hereinafter <br /> referred to as the CONSULTANT, to prepare plans and specifications for the PROJECT. <br /> b. The agreement between the BORROWER and the CONSULTANT and the plans and specifications <br /> must be submitted to the CWCB staff for verification of compliance with the terms of this contract <br /> prior to bid opening. Any modifications to the plans and specifications must be approved in <br /> writing by the CWCB staff. <br /> c. For plans and specifications for all jurisdictional dams and reservoirs, as defined by § 37-87-105 <br /> C.R.S. (1997), the BORROWER shall provide a letter of approval from the State Engineer's Office <br /> prior to construction. <br /> d. CWCB staff must be present at bid opening and must approve the award of the construction <br /> contract. <br /> e. The BORROWER shall contract for the construction of the work with responsible and capable <br /> firms, hereinafter referred to as CONSTRUCTION FIRMS, which CONSTRUCTION FIRMS shall be <br /> selected by the BORROWER and found acceptable by the CWCB staff before work under this <br /> contract begins. <br /> f. The BORROWER must provide a copy of the executed construction contract documents consisting <br /> of the advertisement for bid, contractor's proposal, construction contract, bid bond, performance <br /> bond, payment bond, notice of award, notice to proceedp� r� ce d sample field <br /> order. After the CWCB staff verifies that these documertts c�(�,, h this contract, <br /> the BORROWER may issue the notice to proceed to the CONSTRUCTION FIRMS. <br /> g. The BORROWER shall conduct a pre-construction conference at which time the CWCB staff shall <br /> have the opportunity to review and approve the construction schedule. <br /> h. If the CWCB staff determines that the PROJECT requires a resident inspector during construction, <br /> the BORROWER shall employ an inspector who has been approved by the CWCB staff. <br /> i. The BORROWER shall construct the PROJECT in accordance with the approved plans and <br /> specifications. <br /> j. Upon completion of the PROJECT construction, the BORROWER shall provide as-built drawings of <br /> the PROJECT to the CWCB staff, and, if required by § 37-87-105, C.R.S. (1997), the BORROWER <br /> shall provide the same drawings to the State Engineer's Office for approval and filing. <br /> Western Mutual Ditch Company Page 2 of 13 Loan Contract <br />