Laserfiche WebLink
C. The Borrower warrants that the Pledged Revenues and Pledged Prop rty for this loan are not <br /> encumbered by any other deeds of trust or liens of any party other th the CWCB or in any <br /> other manner, except for the Existing i Parity Loans which sets forth the position of the lien <br /> created by this Contract in relation to any existing lien(s). Documentation establishing the <br /> relative priorities of said liens, if necessary, is attached to the Project Summary and <br /> incorporated herein. <br /> 18. CHANGE OF OWNERSHIP OF WATER SHARES DURING TE ' OF CONTRACT <br /> If the interest rate for this loan is based on the CWCB's agricultural or lended agricultural and <br /> municipal and/or commercial and/or industrial rates, the Borrower agree- to notify the CWCB of <br /> any change of the ownership of the water rights represented by its s 1 ares from irrigation to <br /> municipal or commercial or industrial use. The interest rate shall be revi ed when said change in <br /> ownership would increase the original interest rate by 0.5% or more. The parties shall amend this <br /> Contract including a revised Promissory NOte, to effect said change in int-rest rate. <br /> 19. OPERATION OF PROJECT <br /> The Borrower shall,without expense or legal liability to the CWCB,mana_e,operate,and maintain <br /> the Project continuously in an efficient and economical manner. <br /> 20. DISPUTE RESOLUTION <br /> A. Initial Resolution <br /> Except as herein specifically provided otherwis ,disputes concerni g the performance of this <br /> Contract which cannot be resolved by the signated Contract representatives shall be <br /> referred in writing to a senior departrnental mangement staff mem•-r designated by the State <br /> and a senior manager designated by Borrower or resolution. <br /> B. Resolution of Controversies <br /> i. Resolution of Controversies other than Loan Default <br /> For any dispute not involving borrower's default on the Lo. , if the initial resolution <br /> described in §20.A., fails to resolve the dispute within 60 C usiness Days, Borrower <br /> shall submit any alleged breach of this Contract by the State t Ii the Procurement Official <br /> of the Colorado Department of Natural Resources as described i §24-101-301(30), C.R.S. <br /> for resolution in accordance with the provisions of§§24-116-109, 24-109-101.1, 24- <br /> 109-101.5, 24-109-106, 24-109-107,24-109-201 through 24 109-206, and 24-109-501 <br /> through 24-109-505,C.R.S.,(the"Resolution Statutes"),exc'pt that if Borrower wishes <br /> to challenge any decision rendered by the Procurement Off ial, Borrower's challenge <br /> shall be an appeal to the executive director of the Dep. ment of Personnel and <br /> Administration, or their delegate, under the Resolution .tatutes before Borrower <br /> pursues any further action as permitted by such statutes. Ex ept as otherwise stated in <br /> this Section, all requirements'of the Resolution Statutes sha 1 apply including, without <br /> limitation, time limitations, regardless of whether this 1 ontract is subject to the <br /> Colorado Procurement Code., <br /> ii. Resolution of Controversies 14ot Regarding Loan Default <br /> For any dispute not involving Borrower's default on the Li an, if the initial resolution <br /> described in §20., fails to resolve the dispute within 60 Bus's ess Days,the CWCB will <br /> submit the dispute to the CWCB board for review, who wi 1 determine a resolution to <br /> the dispute. <br /> Page 9 of 19 <br /> Contract Number:CT2019-2099 <br />