Laserfiche WebLink
Section 6—Loan Security <br /> The Security for this loan, as evidenced by the executed Security Agree ent(Appendix 5) and <br /> incorporated herein, shall be: (i)an irrevocable (but not exclusive)pled e to the CWCB of the <br /> Pledged Revenues in such amount as is necessary t• make each annual ayment due under this <br /> Loan Contract, (ii) an assessment covenant; and (iii annual financial re orting and (iv) an <br /> undivided one hundred percent(100%) interest in t e Seeley Dam as m re particularly <br /> described in the attached Deed of Trust(Appendix 0, incorporated her n, and in accordance <br /> with CWCB Policy No. 5. <br /> Section 7—Additional Conditions and Requirements <br /> None. <br /> Section 8—"Construction Fund Program" Procedures fi r Projects <br /> A. The Borrower shall employ an engineer, registered i the State of Color.do to prepare plans and <br /> specifications for the Project. <br /> B. Engineering contracts and the plans and specifications must be submitte• to the CWCB staff for <br /> verification of compliance with the terms of this Contract when availabl- prior to bidding. Any <br /> modifications,to the plans and specifications that effect changes to the c•1 struction costs must be <br /> approved in writing by CWCB. <br /> C. For plans and specifications for all jurisdictional dams and reservoirs,as a efined by <br /> §37-87-105 C.R.S.,the Borrower shall provide a letter of approval from th• State Engineer's Office <br /> prior to construction. <br /> D. The Borrower shall notify CWCB of the bid openin date, time and location. CWCB staff may <br /> elect to attend the bid opening. <br /> E. The Borrower shall contract for the construction of the work with r sponsible and capable <br /> Construction Firms, selected by the Borrower and found acceptable by e CWCB staff. CWCB <br /> must approve the award of the construction contract. <br /> F. The Borrower must provide a copy of the following construction contr. t documents: executed <br /> contractor's proposal, executed construction contract, executed performance bond, executed <br /> payment bond, executed notice of award, proposed notice to proceed, s. ple change order, and <br /> sample field order, as well as the advertisement for bId. After the CWC: staff verifies that these <br /> documents comply with the terms of this Contract, the Borrower may iss e the notice to proceed <br /> to the Construction Firms. <br /> G. The Borrower shall conduct a pre-construction conf rence at which tim- the CWCB staff shall <br /> have the opportunity to review and approve the cons ction schedule. <br /> H. If the CWCB staff determines that the Project requires a resident inspector during construction,the <br /> Borrower shall employ an inspector who has been approved by the CWC„ staff. <br /> I. The Borrower shall construct the Project in accordanc with the approved ilans and specifications. <br /> J. Upon completion of the Project construction, the Bo ower shall provide .s-built drawings of the <br /> Page 2 of 3 <br /> Contract Number:2019-2099 <br /> Appendix 1 <br />