Laserfiche WebLink
and financially feasible. <br /> SECTION 3— CWCB's AUTHORITY <br /> Small Project Loan: This loan is made pursuant to the provisions of §§ 37-60-119 <br /> and 37-60-120, C.R.S., which authorizes the CWCB to loan money for water projects <br /> for the benefit of the people of the State, provided that the borrower assures <br /> repayment of that money. <br /> Section 37-60-122(1)(b) C.R.S., authorizes the CWCB to make loans of up to <br /> $5,000,000 from the CWCB's Construction Fund and the State Severance Tax Trust <br /> Fund Perpetual Base Account Fund without prior approval from the General <br /> Assembly <br /> SECTION 4 - BOARD APPROVAL AND LEGISLATIVE AUTHORIZATION (IF NEEDED) <br /> At its November 2003 meeting, the CWCB approved a Small Project Loan from the <br /> Construction Fund to the BORROWER in an amount up to $4,950,495 for PROJECT costs <br /> plus $49,505 for the 1% loan service charge for a total loan amount of $5,000,000, with <br /> repayment terms of 2.50% per annum for 30 years. <br /> The BORROWER requested that the total loan amount be limited to $4,513,200 <br /> ($4,468,515 for PROJECT costs and $44,685 for the 1% loan service charge) <br /> SECTION 5— SCHEDULE OF EXISTING DEBT <br /> BORROWER'S existing debt consists of (1) CWCB Loan Contract C150117 dated <br /> October 1, 2003, for $15,000,000, and (2) Limited Tax Water Conservancy Bonds <br /> (Bonds), principal amount of $10,000,000, dated April 17, 2003. The Bonds will be <br /> defeased on July 23, 2004, simultaneously with the disbursement of the CWCB loan <br /> funds. <br /> SECTION 6 —ADDITIONAL CONTRACT REQUIREMENTS <br /> The BORROWER must provide an appraisal or written opinion of value of water rights <br /> purchased prior to obtaining the CWCB loan funds. The appraisal or opinion of <br /> value will be provided in accordance with Section 7(M) below. <br /> SECTION 7 — CONSTRUCTION FUND PROGRAM PROCEDURES <br /> A. The BORROWER shall employ an engineer, registered in the state of Colorado to <br /> prepare plans and specifications for the PROJECT. <br /> B. The BORROWER'S and the Engineering Consultant's Agreenas and the plans and <br /> specifications must be submitted to the CWCB staff for verification-of compliance <br /> with the terms of this Contract when available prior to bidding. -Any modifications <br /> to the plans and specifications must be approved in writing:by the CWCB staff. <br /> C. For plans and specifications for all jurisdictional dams and reservoirs, as defined <br /> by § 37-87-105 C.R.S., the BORROWER shall provide a letter of approval from the <br /> State Engineer's Office prior to construction. <br /> Page 2 of 4 <br />