My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2019-2848 Contract
CWCB
>
Loan Projects
>
DayForward
>
7001-8000
>
CT2019-2848 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2019 7:40:56 AM
Creation date
1/7/2019 7:40:44 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2019-2848
Contractor Name
Fruitland Irrigation Company
Contract Type
Grant/Loan Combo
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STATE OF COLORADO LOAN CONTRACT <br /> SIGNATURE AND COVER PAGE <br /> THREE(3)SIGNATURE PAGES(COVER PAGE),WITH ORIGINAL SIGNATURES,ARE REQUIRED <br /> State Agency Contract Number <br /> Department of Natural Resources CMS 105204 <br /> Colorado Water Conservation Board(CWCB) CT2019-2848 <br /> 1313 Sherman St,Room 718 <br /> Denver,CO 80203 <br /> Borrower and Address Loan Contract Project Performance Beginning Date: <br /> Fruitland Irrigation Company The Effective Date(the date the State Controller or an authorized <br /> 34918 Fruitland Mesa Rd. delegate signs this Loan Contract). <br /> Crawford,CO 81415 Loan Contract Proiect Performance End Date: <br /> Entity Type Five(5)years from Effective Date or upon the date of CWCB's <br /> Non-governmental,nonprofit corporation Notice of Project Substantial Completion of the Project. <br /> Base Loan Amount(Amount in CORE) Loan Contract Terms <br /> S 1,729.000.00 2.0%for 40 years <br /> Loan 1%Orieination Fee Proiect Name <br /> S17.290.00 Tunnel and Canal Renovation <br /> Total Loan Amount Loan Contract Purpose <br /> S 1,746.290.00 To stabilize and renovate the tunnels and canals,to assure the <br /> continued ability to deliver irrigation water,while minimizing <br /> seepage losses and salinity contributions to the Colorado River. <br /> THE PARTIES HERETO HAVE EXECUTED THIS CONTRACT <br /> Each person signing this Contract represents and warrants that he or she is duly authorized to execute this Contract and to bind the Patty authorizing his or <br /> her signature. <br /> BORROWER STATE OF COLORADO <br /> Fruitland Irrigation Company John W.Hickenlooper.Governor <br /> /i Colorado Department of Natural Resources <br /> 0 � f6)��/'�/�/ Colorado Water Conserv ation Board(CWCB) <br /> ,-( .2.-(2 <br /> (Signature) / <br /> Name: <br /> 4 iv I y i D (Signature) <br /> j� t Name: Kirk Russell.P.E.,Section Chief <br /> Title: ! 1 e'/? CWCB inane Section <br /> // 2-1 7—D ) F Date: '2�� if <br /> Date: � � ff <br /> ATTEST• <br /> e <br /> (S mire f i�� <br /> Title: (/sc-.w_ , + <br /> ante: / <br /> In accordance with*24-30-20 .R.S.,this Contract is not valid until signed and dated below by the State Controller or an authorized delegate. <br /> STATE CONT'OLLER <br /> Robert Janos,C'A, <br /> 4 B - y Maggie Van(leef <br /> BY: Irl i _ •.10116 <br /> , • ...__...�7�; r' <br /> r,Department of N. esourc-.. I lel eQI.11' Director <br /> Tiffective Date: 1 /�7/DA' nt of Nath Resources <br /> Page 1 of 18 <br /> Contract Number:CT2019-284g <br />
The URL can be used to link to this page
Your browser does not support the video tag.